Paragraph 43D F1
Any difference or dispute arising between the undertaker and EPN under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and EPN, be determined by arbitration in accordance with article 46 (arbitration).
Annotations
Textual amendments
- F1
Sch. 11 Pt. 4 substituted (8.11.2024) by The Medworth Energy from Waste Combined Heat and Power Facility (Correction) Order 2024 (S.I. 2024/1136), art. 1(2), Sch. 2