Paragraph 3 Accuracy testsI1
Northern Ireland
(1)
Apparatus used for determining the errors of meters during these tests shall comply with directions.
(2)
The rate of advance of a meter over a test period shall be obtained by reading the electro-mechanical register or electronic display on or connected to the meter or by monitoring the rotation of the disc or pulse output of meters.
(3)
For any test load applied to the meters under test, the load applied to a working standard integrating meter shall not be less than 25% or more than 125% of its full load rating.
(4)
For a working standard wattmeter, the applied load shall not be less than 40% or more than 100% of its full scale or range reading.
Annotations
Commencement
- I1
Sch. 3 para. 3 in operation at 1.2.1999, see reg. 1