OpenLegislation

Paragraph 121 I1

England and Wales

In this Part—

  • “access plots” means those parts of the Order limits that includes such parts of the Awel y Môr Order land comprising the land within plots 11-221, 11-222, 11-223, 11-224, 11-225, 11-226, 11-227, 11-231, 11-232, 11-234 and 11-235 shown on the land plans and described in the book of reference, which covers private road, verges, agricultural land, private road off Glascoed road, B5381 and public bridleway (BR 208/32) and access splay;

  • “apparatus” means the cables, switchgear, structures or other infrastructure owned, occupied or maintained by Awel y Môr or its successor in title within the Awel y Môr Order Land;

  • “Awel y Môr” means an undertaker with the benefit of all or part of the Awel y Môr Order for the time being;

  • “Awel y Môr Onshore Works” means the proposed location within the Awel y Môr Order land for any electrical circuit(s), electrical substation infrastructure, construction compound(s) and other onshore infrastructure and works (whether temporary or permanent in nature) authorised by the Awel y Môr Order or by any planning permission intended to operate in conjunction with the Awel y Môr Order

  • “Awel y Môr Order” means the development consent order made by the Secretary of State in relation to the Awel y Môr Offshore Wind Farm on 19th September 2023;

  • “Awel y Môr Order land” means Order land as defined in the Awel y Môr Order;

  • “construction” includes execution, placing, altering, replacing, reconstruction, relaying, maintenance, extensions, enlargement and removal; and “construct” and “constructed” must be construed accordingly;

  • “Overlap area” means those parts of the Order limits that includes such parts of the Awel y Môr Order land comprising the land within plots 11-200, 11-201, 11-202, 11-203, 11-204, 11-205, 11-206, 11-207 shown on the land plans and described in the book of reference;

  • “plans” includes sections, drawings, specifications, designs, design data, software, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of the Awel y Môr Order land;

  • “specified works” means so much of any works or operations authorised by this Order (or authorised by any planning permission intended to operate in conjunction with this Order) as is—

    1. (a)

      within the Overlap area;

    2. (b)

      in, on, under, over or within 15 metres of the Awel y Môr Onshore Works or any apparatus; or

    3. (c)

      may in any way adversely affect any apparatus;

  • “temporary works” so much of the specified works which are temporary works as set out within the Order; and

  • “undertaker’s temporary access track” means that part of Work No. 27 falling within part of plot 11-229 and the whole of plots 11-229a, 11-230, 11-230a, 11-233, 11-233a, 11-233b, 11-234, 11-234a, 11-234b.

Annotations

Commencement

I1

Sch. 10 para. 121 in force at 28.7.2025, see art. 1