The Mona Offshore Wind Farm Order 2025
S.I. 2025/870 · Made 4 July 2025 · Extends to England and Wales
Infrastructure Planning
Made 4th July 2025
Coming into force 28th July 2025
An application has been made to the Secretary of State under section 37 of the Planning Act 2008 f1 (“the 2008 Act”) for an Order granting development consent.
The application was examined by a panel of 5 members (appointed by the Secretary of State) in accordance with Part 6 of the 2008 Act and carried out in accordance with the Infrastructure Planning (Examination Procedure) Rules 2010f2.
The panel, having considered the representations made and not withdrawn and the application together with the accompanying documents, in accordance with section 74(2) of the 2008 Act, has submitted a report and recommendation to the Secretary of State.
The Secretary of State has considered the representations made and not withdrawn, and the report and recommendation of the panel, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f3, and, as national policy statements have effect in relation to the proposed development, has had regard to the documents and matters referred to in section 104(2) of the 2008 Act.
The Secretary of State is satisfied that the open space forming special category land specified in the land plan (onshore) and special category land plan (as defined in article 2 of this Order), when burdened with any new rights authorised to be compulsorily acquired under this Order, will be no less advantageous than it was before to the persons in whom it is vested, other persons, and the public, and that, accordingly, section 132(3) of the 2008 Act applies.
The Secretary of State, having decided the application, has determined to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120, 122, 123, 132, 140 and 149A and schedule 5 to the 2008 Act, makes the following Order:
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by section 128(2) and Schedule 13, Part 1, paragraphs 1 to 5 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2010/103. This instrument was amended by S.I. 2012/635.
- f3
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal Powers
- 3Development consent etc. granted by the Order
- 4Operation of generating station
- 5Deemed marine licence under the 2009 Act
- 6Power to maintain the authorised project
- 7Benefit of the Order
- 8Application and modification of legislative provisions
- 9Defence to proceedings in respect of statutory nuisance
- Part 3: Streets
- 10Street works
- 11Application of the 1991 Act
- 12Temporary restriction of use of streets
- 13Temporary closure of public rights of way
- 14Access to works
- 15Agreements with street authorities
- Part 4: Supplemental powers
- 16Discharge of water
- 17Authority to survey and investigate the land
- 18Protective work to buildings
- Part 5: Powers of acquisition
- 19Compulsory acquisition of land
- 20Time limit for exercise of authority to acquire land compulsorily
- 21Compulsory acquisition of rights
- 22Compulsory acquisition of land: minerals
- 23Private rights
- 24Application of the 1981 Act
- 25Acquisition of subsoil only
- 26Modification of Part 1 of the 1965 Act
- 27Rights under or over streets
- 28Temporary use of land for carrying out the authorised project
- 29Temporary use of land for maintaining the authorised project
- 30Statutory undertakers
- 31Recovery of costs of new connections
- 32Funding
- Part 6: Miscellaneous and general
- 33Application of landlord and tenant law
- 34Felling or lopping of trees and removal of hedgerows
- 35Trees subject to tree preservation orders
- 36Abatement of works abandoned or decayed
- 37Saving provisions for Trinity House
- 38Crown rights
- 39Protective provisions
- 40Operational land for the purposes of the 1990 Act
- 41Certification of plans and documents, etc.
- 42Service of notices
- 43No double recovery
- 44Requirements, appeals, etc.
- 45Arbitration
- Signature
- Schedule 1: Authorised Project
- 1Authorised Development
- 1Paragraph 1
- Part 2: Ancillary Works
- 2Paragraph 2
- Schedule 2: Requirements
- 1Time limits
- 2Offshore design parameters
- 3Aviation safety
- 4Stages of authorised project
- 5Onshore Substation works
- 6Detailed design parameters onshore
- 7Provision of landscaping
- 8Implementation and maintenance of landscaping
- 9Code of construction practice
- 10Highway accesses
- 11Onshore archaeology
- 12Landscape and ecology management plan
- 13European protected species onshore
- 14Construction hours
- 15Restoration of land used temporarily for construction
- 16Control of operational artificial light emissions
- 17Control of noise during operational stage
- 18Operational drainage
- 19Skills and Employment plan
- 20Offshore decommissioning
- 21Onshore decommissioning
- 22Great Dun Fell, Lowther Hill and St. Anne’s Primary Surveillance Radar
- 23Warton Aerodrome Primary Surveillance Radar
- 24Air traffic services at Liverpool John Lennon Airport
- 25Operation of Blackpool Airport
- 26Air traffic services at Isle of Man Airport
- 27Operation of Walney Aerodrome (Air traffic services)
- 28Operation of Warton Aerodrome (Air traffic services)
- 29Wake effects
- 30Landscape enhancement scheme
- 31Requirement for written approval
- 32Amendments to approved details
- Schedule 3Streets subject to street works
- Schedule 4Streets to be temporarily closed or restricted
- Schedule 5Public rights of way to be temporarily closed or restricted
- Schedule 6Access to works
- Schedule 7Land of which only temporary possession may be taken
- Schedule 8Land in which only new rights etc. may be acquired
- Schedule 9: Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictions
- 1Compensation enactments
- 2Compensation enactments
- 3Compensation enactments
- 4Application of Part 1 of the 1965 Act
- 5Application of Part 1 of the 1965 Act
- Schedule 10: Protective provisions
- Part 1: Protection of electricity, gas, water and sewerage undertakers
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Acquisition of land
- 5Removal of apparatus
- 6Facilities and rights for alternative apparatus
- 7Retained apparatus
- 8Expenses and costs
- 9Expenses and costs
- 10Miscellaneous
- 11Miscellaneous
- Part 2: Protection for operators of electronic communications code networks
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Part 3: For the protection of Dŵr Cymru Cyfyngedig (DC)
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Precedence of the WIA 1991
- 20Protection of DC apparatus
- 21Suspension of works
- 22Co-Operation
- 23Emergency Works
- 24Damage to DC apparatus
- Part 4: For the protection of SP Manweb as electricity undertaker
- 25Application
- 26Interpretation
- 27On Street Apparatus
- 28Acquisition of land
- 29Removal of apparatus
- 30Facilities and rights for alternative apparatus
- 31Retained apparatus: Protection of SP Manweb as Electricity Undertaker
- 32Expenses
- 33Indemnity
- 34Enactments and agreements
- 35Co-operation
- 36Access
- 37Arbitration
- Part 5: For the protection of Wales and West Utilities
- 38Paragraph 38
- 39Paragraph 39
- 40On street apparatus and offshore works
- 41Apparatus in streets subject to temporary restriction
- 42Acquisition by agreement
- 43Removal of apparatus
- 44Facilities and rights for alternative apparatus
- 45Retained apparatus
- 46Expenses and costs
- 47Co-operation
- 48Enactments and agreements
- Part 6: For the protection of the Welsh Ministers as Strategic Highway Authority
- 49Application
- 50Interpretation
- 51Approvals
- 52Approvals
- 53Approvals
- 54Approvals
- 55Approvals
- 56Approvals
- 57Approvals
- 58Indemnity
- 59Indemnity
- 60Traffic management
- 61Traffic management
- 62Inspections
- 63Inspections
- 64Inspections
- 65Inspections
- 66Reinstatement
- 67Reinstatement
- 68Reinstatement
- 69Notice of completion of Works
- 70Notice of completion of Works
- 71Notice of completion of Works
- 72Notice of completion of Works
- 73Arbitration
- 74Notices
- 75Cease of Use or Abandonment
- 76Cease of Use or Abandonment
- 77Cease of Use or Abandonment
- 78Maintenance
- Part 7: For the protection of National Grid Electricity Transmission Plc as electricity undertaker
- 79Application
- 80Interpretation
- 81Interaction with the Bodelwyddan Project and the Connah’s Quay Project
- 82Mona project works
- 83Mona project works
- 84Mona project works
- 85Mona project works
- 86On Street Apparatus
- 87Apparatus in temporarily closed streets
- 88Protective works to buildings
- 89Acquisition of land
- 90Removal of apparatus
- 91Facilities and rights for alternative apparatus
- 92Retained apparatus: Protection of National Grid Electricity Transmission Plc as Electricity Undertaker
- 93Expenses
- 94Indemnity
- 95Enactments and agreements
- 96Co-operation
- 97Access
- 98Arbitration
- 99Notices
- Part 8: For the protection of Network Rail Limited
- 100Paragraph 100
- 101Paragraph 101
- 102Paragraph 102
- 103Paragraph 103
- 104Paragraph 104
- 105Paragraph 105
- 106Paragraph 106
- 107Paragraph 107
- 108Paragraph 108
- 109Paragraph 109
- 110Paragraph 110
- 111Paragraph 111
- 112Paragraph 112
- 113Paragraph 113
- 114Paragraph 114
- 115Paragraph 115
- 116Paragraph 116
- 117Paragraph 117
- 118Paragraph 118
- 119Paragraph 119
- Part 9: For the protection of Awel y Môr
- 120Paragraph 120
- 121Paragraph 121
- 122Paragraph 122
- 123Paragraph 123
- 124Paragraph 124
- 125Paragraph 125
- 126Paragraph 126
- 127Paragraph 127
- 128Paragraph 128
- 129Paragraph 129
- 130Paragraph 130
- 131Paragraph 131
- 132Paragraph 132
- 133Paragraph 133
- 134Paragraph 134
- 135Paragraph 135
- 136Paragraph 136
- Schedule 11: Removal of hedgerows
- 1Removal of hedgerows
- 2Removal of important hedgerows
- 3Trees subject to tree preservation orders
- Schedule 12: Approval of matters specified in requirements
- 1Interpretation
- 2Interpretation
- 3Applications made under requirements
- 4Further information
- 5Provision of information by Consultees
- 6Fees
- 7Appeal
- Schedule 13: Arbitration rules
- 1Primary objective
- 2Time periods
- 3Timetable
- 4Procedure
- 5Arbitrator’s powers
- 6Costs
- 7Confidentiality
- Schedule 14: Marine Licence ORML2429G: Mona Offshore Wind Farm Generation Assets
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Details of licensed marine activities
- 4Details of licensed marine activities
- 5Details of licensed marine activities
- 6Details of licensed marine activities
- 7Details of licensed marine activities
- 8Details of licensed marine activities
- Part 2: Conditions
- 9Design parameters
- 10Maintenance of the authorised scheme
- 11Extension of time periods
- 12Notifications and inspections
- 13Colouring of structures
- 14Aids to navigation
- 15Chemicals, drilling and debris
- 16Force majeure and dropped objects
- 17Pre-construction plans and documentation
- 18Pre-construction plans and documentation
- 19Underwater Sound Management Strategy
- 20Low order unexploded ordnance clearance
- 21Offshore safety management
- 22Reporting of engaged agents, contractors and vessels
- 23Pre-construction surveys
- 24Construction monitoring
- 25Post-construction monitoring
- 26Reporting of scour and cable protection
- 27Completion of construction
- 28Marine Noise Registry
- 29Requirement for written approval
- Schedule 15Documents to be certified
- Explanatory note