OpenLegislation

Schedule 7 Land of which only temporary possession may be takenI1

England and Wales

In the County of Conwy:

(1)

Number of plot shown on land plan (onshore)

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of authorised project

01-001, 01-002Access to Work No. 3 during constructionWork Nos. 3 and 4
01-003, 01-004,Temporary construction compound for vehicle parking, a circulation area and a laydown area of up to 800 square metres including fencing together with access to Work No. 4 during constructionWork Nos. 4 and 7
01-005, 01-006, 01-007, 01-008, 01-009, 01-010, 01-011Access during constructionWork Nos. 5, 7 and 8
02-013, 02-013a, 02-014, 02-015, 02-016, 02-017, 02-018, 02-019, 02-020Access to Work No. 8 during constructionWork Nos. 6 and 8
02-030Access to Work No. 10 during construction including works to the public highway and visibility splaysWork Nos. 9 and 10
03-052, 03-055, 03-057, 03-058, 04-068, 04-069, 04-071, 04-076Access to Work No. 12 during constructionWork Nos. 12 and 12a
05-094, 05-095, 06-099, 06-102, 06-104Temporary construction compounds and laydown areas with a total maximum area of 37,500 square metres and access to Work Nos. 12 and 14 during construction including works to the public highway and visibility splaysWork Nos. 12, 13 and 14

In the County of Denbighshire:

(1)

Number of plot shown on land plan (onshore)

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of authorised project

09-160, 09-162, 09-163, 09-164, 09-165Temporary construction compound and laydown area of up to 22,500 square metres and access to Work No. 17 during construction including works to the public highway and visibility splaysWork Nos. 17 and 18
09-166, 09-167Temporary works to the public highway including visibility splaysWork No. 19
11-197a, 11-223b, 11-228, 11-229a, 11-230, 11-230a, 11-233, 11-233a, 11-233b, 11-234, 1-234a, 11-234b, 11-236Access during construction including works to the public highway and visibility splaysWork Nos. 22, 22a, 27, 28, 29 and 30
11-197bOnshore site preparation worksWork No. 27
11-228, 11-229Temporary construction compound and laydown area of up to 7,100 square metresWork Nos. 22, 22a, 27, 28, 29 and 30
11-221aTemporary construction area to facilitate the construction of permanent accessWork Nos. 27 and 29
11-215, 11-218, 11-218aTemporary landscaping, ecological and environmental works in relation to the substation constructionWork Nos. 22, 22a and 31

Annotations

Commencement

I1

Sch. 7 in force at 28.7.2025, see art. 1