Schedule 8 Land in which only new rights etc. may be acquiredI1F1
England and Wales
In the County of Conwy:
(1) Number of plot shown on land plan (onshore) | (2) Purpose for which rights may be acquired |
|---|---|
| 02-033; 03-037; 03-045; 03-047; 03-049; 03-050; 03-060; 03-062; 03-063; 04-067; 04-070; 04-074; 04-078; 05-080; 05-083; 05-084; 05-087; 05-088; 05-091; 05-093; 06-097; 06-100; 06-106a; 06-103; 06-105; 06-106; 06-108; 07-109; 07-111; 07-117; 07-120; 07-125; 07-127; 07-129; 07-133; 08-136; 08-146 | Cable rights and restrictive covenants 1.Cable rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to: (a) prevent anything being done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto); (b) prevent anything being done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); (c) to prevent anything to be done by way of excavation of any kind in the land or any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.6 metres for the purposes of arable farming) or are required to be carried out by any statutory undertaker in order to exercise their statutory functions or rights in relation to their apparatus (if any) within the land without the consent in writing of the undertaker; (d) to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access and maintain the relevant part of the authorised project); (e) to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; (f) to prevent the carrying out of operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and (g) to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation or enhancement including any ploughing or grazing without the prior written consent of the undertaker. |
| 02-012; 02-021; 02-021a; 02-022; 02-023; 02-024; 02-025; 02-026; 02-027; 02-028; 02-029; 02-031; 02-034; 02-035; 02-036; 03-061; 04-065; 04-073; 05-082; 06-096; 06-098; 06-101; 07-110; 07-126; 08-135; 08-140 | Cable rights under existing infrastructure and restrictive covenants 1. Cable rights under existing infrastructure Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to: (a) prevent anything being done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto) other than those related to works for the benefit of existing highway or railway infrastructure; (b) to prevent anything to be done by way of excavation of any kind in the land nor any activities which would alter, increase or decrease ground cover or soil levels by greater than one metre whatsoever without the consent in writing of the undertaker, save where such works are reasonably required for the exercise of statutory functions or rights in relation any public highway or railway on the land and will not damage, undermine or interfere with the cables; (c) to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access and maintain the relevant part of the authorised project); (d) to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; and (e) to prevent the carrying out of operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project. |
| 02-032 | Cable rights, transition joint bay rights and restrictive covenants 1. Cable rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2.Transition joint bay rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace transition joint bays. 3. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to: (a) prevent anything being done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto); (b) prevent anything being done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); (c) to prevent anything to be done by way of excavation of any kind in the land or any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.6 metres for the purposes of arable farming) or are required to be carried out by any statutory undertaker in order to exercise their statutory functions or rights in relation to their apparatus (if any) within the land without the consent in writing of the undertaker; (d) to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access and maintain the relevant part of the authorised project); (e) to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; (f) to prevent the carrying out of operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and (g) to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation or enhancement including any ploughing or grazing without the prior written consent of the undertaker. |
| 03-038; 03-046; 03-048; 03-051; 03-053; 03-054; 03-056; 03-059; 03-064; 04-066; 04-072; 04-075; 04-077; 04-079; 05-081; 05-085; 05-086; 05-089; 05-090; 05-092; 06-107; 07-116; 07-128; 07-134; 08-147; 08-148 | Cable corridor access rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
|
| 03-039; 03-040; 03-041; 03-042; 03-043; 03-044; 07-112; 07-113; 07-114; 07-115; 07-118; 07-119; 07-121; 07-122; 07-123; 07-124; 07-130; 07-131; 07-132; 08-141; 08-142; 08-143; 08-144; 08-145; 08-149 | Hedgerow enhancement rights and restrictive covenants 1. Hedgerow enhancement rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the hedgerow enhancement works without the prior written consent of the undertaker or as authorised by a planning permission or consent granted over the land. |
In the County of Denbighshire:
(1) Number of plot shown on land plan (onshore) | (2) Purpose for which rights may be acquired |
|---|---|
| 08-146, 08-150; 08-154; 09-157; 09-158; 09-159; 09-168; 09-169; 09-171; 09-172; 09-173a; 09-173b; 09-174; 09-175; 09-176; 09-177; 09-178; 10-179; 10-180; 10-183; 10-184; 10-185; 10-188 | Cable rights and restrictive covenants 1. Cable rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to: (a) prevent anything being done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto); (b) prevent anything being done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); (c) to prevent anything to be done by way of excavation of any kind in the land or any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.6 metres for the purposes of arable farming) or are required to be carried out by any statutory undertaker in order to exercise their statutory functions or rights in relation to their apparatus (if any) within the land without the consent in writing of the undertaker; (d) to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access and maintain the relevant part of the authorised project); (e) to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; (f) to prevent the carrying out of operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and (g) to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation or enhancement including any ploughing or grazing without the prior written consent of the undertaker. |
| 08-153; 09-173; 10-182; 11-189 | Cable rights under existing infrastructure and restrictive covenants 1. Cable rights under existing infrastructure Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to: (a) prevent anything being done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto) other than those related to works for the benefit of existing highway or railway infrastructure; (b) to prevent anything to be done by way of excavation of any kind in the land nor any activities which would alter, increase or decrease ground cover or soil levels by greater than one metre whatsoever without the consent in writing of the undertaker, save where such works are reasonably required for the exercise of statutory functions or rights in relation any public highway or railway on the land and will not damage, undermine or interfere with the cables; (c) to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access and maintain the relevant part of the authorised project); (d) to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; and (e) to prevent the carrying out of operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project. |
| 08-148; 08-151; 08-152; 09-161; 09-170; 10-181; 10-186; 10-187; 11-196; 11-221; 11-231; 11-232; 11-235 | Cable corridor access rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to— (a) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of the authorised project, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the cables and connection into any adjacent cables and associated works, to take plant and equipment on to adjoining land and make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; (b) to construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and the highway; (c) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair, renewal or decommissioning is being carried out; (d) erect temporary bridges and supporting or protective structures for the purposes of access to adjoining land; (e) place and use plant, machinery, structures and temporary structures within the land, and to erect temporary signage and provide measures for the benefit of public and personnel safety; (f) fell, lop, cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be present on the land for the purpose of enabling the right to pass and re-pass to adjoining land; (g) repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; (h) erect and remove temporary fencing, gates, walls, barriers or other means of enclosure; and (i) lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair or renewal decommissioning is being carried out. |
| 08-149; 09-155; 09-156; 11-193; 11-194; 11-195, 11-195a | Hedgerow enhancement rights and restrictive covenants 1.Hedgerow enhancement rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the hedgerow enhancement works without the prior written consent of the undertaker or as authorised by a planning permission or consent granted over the land. |
| 11-191; 11-192; 11-214 | Landscaping and ecological mitigation works rights and restrictive covenants 1. Landscaping and ecological mitigation works rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of landscaping or ecological mitigation measures or works or areas of habitat creation including any ploughing or grazing, during the period within which the undertaker is bound by any consent or licence to maintain that ecological mitigation measures or works or areas of habitat creation, without the prior written consent of the undertaker. |
| 11-198; 11-200; 11-201; 11-202; 11-203; 11-204; 11-205; 11-206; 11-207; 11-226; 11-227 | National Grid connection rights and restrictions 1.Rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
2. Restrictive covenants A restrictive covenant over the land for the benefit of the remainder of the Order land to: (a) prevent anything being done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto); (b) prevent anything being done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); (c) to prevent anything to be done by way of excavation of any kind in the land or any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.6 metres for the purposes of arable farming) or are required to be carried out by any statutory undertaker in order to exercise their statutory functions or rights in relation to their apparatus (if any) within the land without the consent in writing of the undertaker; (d) to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access and maintain the relevant part of the authorised project); (e) to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; (f) to prevent the carrying out of operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and (g) to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation or enhancement including any ploughing or grazing without the prior written consent of the undertaker. |
| 11-221; 11-222; 11-223; 11-224; 11-225; 11-231; 11-232; 11-235 | National Grid substation access rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
|
| 11-221; 11-231; 11-232; 11-235 | Landscaping and ecological mitigation land access rights Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—
|
Annotations
Textual amendments
- F1
Word in Sch. 8 substituted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
Commencement
- I1
Sch. 8 in force at 28.7.2025, see art. 1