Work No. 1 and Work No. 2 are to be constructed seaward of MHWS within the area delineated by the coordinates shown on the offshore order limits and grid coordinates plan and listed in Table 1 below—

Table 1

PointLatitudeLongitude
153° 50′ 11.03673656″ N003° 36′ 31.65915051″ W
253° 49′ 41.72634557″ N003° 34′ 15.69323747″ W
353° 49′ 45.14948499″ N003° 29′ 48.00160838″ W
453° 45′ 16.81576507″ N003° 29′ 38.45882862″ W
553° 45′ 00.78002400″ N003° 36′ 04.79995593″ W
F16 53° 46′ 45.95836718″ N003° 40′ 53.89383116″ W

Annotations

Textual amendments

F1

Words in Sch. 1 Pt. 1 Table 1 inserted (8.6.2026) by The Morecambe Offshore Windfarm Generation Assets (Correction) Order 2026 (S.I. 2026/608), art. 1, Sch.

Commencement

I1

Sch. 1 Pt. 1 para. 2 in force at 23.12.2025, see art. 1