Paragraph 2 I1
England, Wales and Scotland
Work No. 1 and Work No. 2 are to be constructed seaward of MHWS within the area delineated by the coordinates shown on the offshore order limits and grid coordinates plan and listed in Table 1 below—
Table 1
| Point | Latitude | Longitude |
|---|---|---|
| 1 | 53° 50′ 11.03673656″ N | 003° 36′ 31.65915051″ W |
| 2 | 53° 49′ 41.72634557″ N | 003° 34′ 15.69323747″ W |
| 3 | 53° 49′ 45.14948499″ N | 003° 29′ 48.00160838″ W |
| 4 | 53° 45′ 16.81576507″ N | 003° 29′ 38.45882862″ W |
| 5 | 53° 45′ 00.78002400″ N | 003° 36′ 04.79995593″ W |
| F16 | 53° 46′ 45.95836718″ N | 003° 40′ 53.89383116″ W |
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 1 Table 1 inserted (8.6.2026) by The Morecambe Offshore Windfarm Generation Assets (Correction) Order 2026 (S.I. 2026/608), art. 1, Sch.
Commencement
- I1
Sch. 1 Pt. 1 para. 2 in force at 23.12.2025, see art. 1