The Morecambe Offshore Windfarm Generation Assets Order 2025
S.I. 2025/1366 · Made 1 December 2025 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 1st December 2025
Coming into force 23rd December 2025
The application was examined by an Examining Authority of three members (appointed by the Secretary of State) in accordance with Part 6 of the 2008 Act and carried out in accordance with the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Examining Authority, having considered the application together with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74(2)f4 of the 2008 Act made a report and recommendation to the Secretary of State.
The Secretary of State has considered the representations made and not withdrawn, and the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f5, and, as national policy statements have effect in relation to the proposed development, has had regard to the documents and matters referred to in section 104f6 of the 2008 Act.
The Secretary of State in exercise of the powers conferred by sections 114, 115, 120f7, 140 and 149Af8 of the 2008 Act, makes the following Order.
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by section 128(2) of, and paragraphs 1 to 5 of Part 1 of Schedule 13 to, the Localism Act 2011 (c. 20).
- f2
- f3
-
S.I. 2010/103, amended by S.I. 2012/635.
- f4
-
Section 74 was amended by paragraph 29 of Schedule 13 to the Localism Act 2011 (c. 20).
- f5
- f6
-
Section 104 was amended by paragraphs 49 and 54 of Schedule 13 to the Localism Act 2011 (c. 20).
- f7
-
Sections 114, 115 and 120 were amended by sections 128(2) and 140 and Schedule 13, paragraphs 1, 55(1), (2) and 60(1) and (3) of the Localism Act 2011 (c. 20). Relevant amendments were made to section 115 by section 160(1) to (6) of the Housing and Planning Act 2016 (c. 22).
- f8
-
Section 149A was inserted by paragraph 4 in Part 1 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23).
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal Powers
- 3Development consent etc. granted by this Order
- 4Operation of a generating station
- 5Deemed marine licence under the 2009 Act
- 6Power to maintain the authorised project
- 7Benefit of this Order
- Part 3: Miscellaneous and general
- 8Abatement of works abandoned or decayed
- 9Saving provisions for Trinity House
- 10Crown rights
- 11Protective provisions
- 12Certification of documents and plans, etc.
- 13Service of notices
- 14Requirements, appeals, etc.
- 15Arbitration
- 16Approvals
- 17Compensation measures
- 18Guarantees in respect of payment of compensation
- Signature
- Schedule 1: Authorised Project
- Part 1: Authorised Development
- 1Paragraph 1
- 2Paragraph 2
- Part 2: Ancillary works
- 1Paragraph 1
- Schedule 2: Requirements
- 1Time limits
- 2Design parameters
- 3Aviation safety
- 4Great Dun Fell, Lowther Hill and St Annes Primary Surveillance Radars
- 5Operation of Blackpool Airport
- 6Operation of Walney Aerodrome (Air Traffic Services)
- 7Operation of Warton Aerodrome (Air Traffic Services)
- 8Warton Aerodrome Primary Surveillance Radar
- 9Air traffic services at Isle of Man Airport
- 10Decommissioning
- 11Port Access and Transport Plan
- 12Skills and Employment Plan
- 13Wake Effects
- Schedule 3: Protective provisions
- Part 1: For the protection of offshore cables
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- Part 2: For the protection of Harbour Energy
- 1Application
- 2Interpretation
- 3Restriction on authorised development
- 4Paragraph 4
- 5Paragraph 5
- 6Coexistence agreement
- 7Provision of information
- 8Cooperation
- 9Paragraph 9
- 10Arbitration
- Part 3: For the protection of Spirit Energy Production UK Limited
- 1Application
- 2Interpretation
- 3Restriction on authorised development
- 4Simultaneous Operations
- 5Cooperation
- 6Paragraph 6
- 7Costs
- 8Arbitration
- Part 4: For the protection of the Calder duty holder
- 1Application
- 2Interpretation
- 3Restriction on authorised development
- 4Simultaneous operations
- 5Cooperation
- 6Costs
- 7Arbitration
- Part 5: For the protection of the MNZ licence holder
- 1Application
- 2Interpretation
- 3Restriction on authorised development
- 4Simultaneous operations
- 5Cooperation
- 6Paragraph 6
- 7Arbitration
- Part 6: For the protection of Stena Line Limited
- 1Application
- 2Interpretation
- 3Consultation and notification
- 4Paragraph 4
- 5Vessel Traffic Management Plan
- 6Co-operation and reasonableness
- 7Miscellaneous
- 8Paragraph 8
- Schedule 4: Approval of matters specified in requirements
- 1Interpretation
- 2Applications made under requirements
- 3Further information
- 4Provision of information by requirement consultees
- 5Appeal
- Schedule 5: Arbitration rules
- 1Primary objective
- 2Time periods
- 3Timetable
- 4Procedure
- 5Arbitrator’s powers
- 6Costs
- 7Confidentiality
- Schedule 6: Deemed Marine Licence under the 2009 Act: Morecambe Offshore Windfarm Generation Assets
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- Part 2: Conditions
- 1Design parameters
- 2Maintenance of the authorised project
- 3Extension of time periods
- 4Notifications and inspections
- 5Aids to navigation
- 6Colouring of Structures
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10Paragraph 10
- 11Safety zones
- 12Offshore safety management
- 13Reporting of engaged agents, contractors and vessels
- 14Pre-construction monitoring and surveys
- 15Construction monitoring
- 16Post-construction monitoring
- 17Reporting of scour and cable protection
- 18Completion of construction
- 19Marine Noise Registry
- 20Underwater sound management strategy
- 21Deployment of new cable protection and scour protection
- Schedule 7: Compensation Measures
- Part 1: Compensation measures: Morecambe Bay and Duddon Estuary Special Protection Area and Ribble and Alt Estuaries Special Protection Area
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Part 2: Compensation measures: Liverpool Bay / Bae Lerpwl Special Protection
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- Schedule 8Documents to be certified
- Explanatory note