Schedule 8 Documents to be certifiedI1

England, Wales and Scotland

The documents listed in Table 5 are the listed documents referred to in article 12 (certification of documents and plans, etc.)—

Table 5

Document Reference NumberPlanning Inspectorate ReferenceDocument NameRevisionDate
2.1APP-005Offshore Location Plan01May 2024
2.3APP-007Offshore Works Plan01May 2024
2.4APP-008Offshore Order Limits and Grid Coordinates Plan01May 2024
2.5APP-009Indicative Extent of Marine Licence01May 2024
2.6AS-003Offshore Statutory and Non-Statutory Nature Conservation Sites02July 2024
2.7APP-011Historic Environment Plan01May 2024
4.3REP5a-007Design Statement04April 2025
Habitats Regulations Assessment Report
4.9REP5a-009Report to Inform Appropriate Assessment05April 2025
4.11REP5a-011Habitats Regulations Assessment Without Prejudice Derogation Case04April 2025
4.11.1REP5a-013Outline Compensation Implementation and Monitoring Plan02April 2025
9.37REP5a-046Habitats Regulations Assessment Without Prejudice Derogation Case (RTD)03April 2025
9.38REP5a-048Outline Compensation Implementation and Monitoring Plan – Red-throated diver02April 2025
Environmental Statement
5.1.1REP1-020Chapter 1 Introduction02November 2024
5.1.2APP-039Chapter 2 Need for the Project01May 2024
5.1.3APP-040Chapter 3 Policy and Legislation01May 2024
5.1.4APP-041Chapter 4 Site Selection and Assessment of Alternatives01May 2024
5.1.5REP1-022Chapter 5 Project Description02November 2024
5.1.6APP-043Chapter 6 EIA Methodology01May 2024
5.1.7REP5a-015Chapter 7 Marine Geology Oceanography and Physical Processes05April 2025
5.1.8REP2-010Chapter 8 Marine Sediment and Water Quality03December 2024
5.1.9REP5a-017Chapter 9 Benthic Ecology04April 2025
5.1.10REP3-016Chapter 10 Fish and Shellfish Ecology03January 2025
5.1.11REP5a-019Chapter 11 Marine Mammals05April 2025
5.1.12REP6-009Chapter 12 Offshore Ornithology04April 2025
5.1.13REP3-018Chapter 13 Commercial Fisheries02January 2025
5.1.14REP3-020Chapter 14 Shipping and Navigation02January 2025
5.1.15REP3-022Chapter 15 Marine Archaeology and Cultural Heritage03January 2025
5.1.16REP3-024Chapter 16 Civil and Military Aviation and Radar03January 2025
5.1.17REP1-038Chapter 17 Infrastructure and Other Users02November 2024
5.1.18REP3-026Chapter 18 Seascape Landscape and Visual Impact Assessment.02January 2025
5.1.19REP6-011Chapter 19 Human Health03April 2025
5.1.20APP-057Chapter 20 Socio-economics Tourism and Recreation01May 2024
5.1.21REP6-013Chapter 21 Climate Change03April 2025
5.1.22APP-059Chapter 22 Traffic and Transport01May 2024
5.1.23REP1-042Chapter 23 Summary: Generation and Transmission Assets Assessment02November 2024
5.2.6.1APP-061Appendix 6.1 CEA Project Long List01May 2024
5.2.7.1APP-062Appendix 7.1 Offshore Geophysical Survey01May 2024
5.2.9.1APP-063Appendix 9.1 Benthic Characterisation Survey01May 2024
5.2.9.2APP-064Appendix 9.2 Marine Evidence-based Sensitivity Assessment01May 2024
5.2.11.1REP4-013Appendix 11.1 Underwater Noise Assessment02February 2025
5.2.11.2REP4-015Appendix 11.2 Marine Mammal Information and Survey Data04February 2025
5.2.11.3REP4-017Appendix 11.3 Marine Mammal Unexploded Ordnance Assessment03February 2025
5.2.11.4REP4-019Appendix 11.4 Marine Mammal CEA Project Screening03February 2025
5.2.11.5APP-069Appendix 11.5 Marine Mammal Consultation Responses01May 2024
5.2.12.1APP-070Appendix 12.1 Offshore Ornithology Technical Report01May 2024
5.2.12.2APP-071Appendix 12.2 Aerial Survey Two Year Report March 2021 to February 202301May 2024
5.2.13.1REP2-014Appendix 13.1 Commercial Fisheries Technical Report02December 2024
5.2.14.1REP3-028Appendix 14.1 Navigation Risk Assessment02January 2025
5.2.14.2APP-074Appendix 14.2 Cumulative Regional Navigation Risk Assessment01May 2024
5.2.15.1APP-075Appendix 15.1 Archaeological Assessment of Geophysical and Hydrographic Data01May 2024
5.2.15.2APP-076Appendix 15.2 Seismic Data Review01May 2024
5.2.15.3REP3-030Appendix 15.3 Settings Assessment02May 2024
5.2.16.1REP1-050Appendix 16.1 Airspace Analysis and Radar Modelling02November 2024
5.2.16.2REP3-032Appendix 16.2 Blackpool Instrument Flight Procedure Safeguarding Report02January 2025
5.2.16.3APP-080Appendix 16.3 Other Instrument Flight Procedure Assessments01May 2024
5.2.17.1APP-081Appendix 17.1 Helicopter Access Study01May 2024
5.2.17.2REP3-034Appendix 17.2 Radar Early Warning System Technical Report02May 2024
5.2.18.1APP-083Appendix 18.1 SLVIA Methodology01May 2024
5.2.18.2REP1-052Appendix 18.2 SLVIA Preliminary Assessment02November 2024
5.2.18.3APP-085Appendix 18.3 SLVIA Viewpoint Assessment01May 2024
5.2.20.1APP-086Appendix 20.1 Offshore Windfarm Economic Impact Assessment Methodology01May 2024
5.2.21.1REP5-018Appendix 21.1 Greenhouse Gas Assessment Methodology02March 2025
5.3.1APP-088Chapter 1 Introduction Figures01May 2024
5.3.4APP-089Chapter 4 Site Selection and Assessment of Alternatives Figures01May 2024
5.3.5APP-090Chapter 5 Project Description Figures01May 2024
5.3.7REP3-036Chapter 7 Marine Geology Oceanography and Physical Processes Figures03January 2025
5.3.8APP-092Chapter 8 Marine Sediment and Water Quality Figures01May 2024
5.3.9APP-093Chapter 9 Benthic Ecology Figures01May 2024
5.3.10PD1-008Chapter 10 Fish and Shellfish Ecology Figures02October 2024
5.3.11APP-095Chapter 11 Marine Mammals Figures01May 2024
5.3.12APP-096Chapter 12 Offshore Ornithology Figures01May 2024
5.3.13APP-097Chapter 13 Commercial Fisheries Figures01May 2024
5.3.14APP-098Chapter 14 Shipping and Navigation Figures01May 2024
5.3.15APP-099Chapter 15 Marine Archaeology and Cultural Heritage Figures01May 2024
5.3.15.1APP-100Appendix 15.3 Generation Assets Setting Assessment Cultural Heritage Viewpoint 101May 2024
5.3.15.2APP-101Appendix 15.3 Generation Assets Setting Assessment Cultural Heritage Viewpoint 201May 2024
5.3.15.3APP-102Appendix 15.3 Generation Assets Setting Assessment Cultural Heritage Viewpoint 301May 2024
5.3.15.4APP-103Appendix 15.3 Generation Assets Setting Assessment Cultural Heritage Viewpoint 401May 2024
5.3.16REP3-037Chapter 16 Civil and Military Aviation and Radar Figures02January 2025
5.3.17APP-105Chapter 17 Infrastructure and Other Users Figures01May 2024
5.3.18.1APP-106Chapter 18 SLVIA Figures Part 1 of 3401May 2024
5.3.18.2REP3-038Chapter 18 SLVIA Figures Part 2 of 3402January 2025
5.3.18.3APP-108Chapter 18 SLVIA Figures Part 3 of 3401May 2024
5.3.18.4APP-109Chapter 18 SLVIA Figures Part 4 of 3401May 2024
5.3.18.5APP-110Chapter 18 SLVIA Figures Part 5 of 3401May 2024
5.3.18.6APP-111Chapter 18 SLVIA Figures Part 6 of 3401May 2024
5.3.18.7APP-112Chapter 18 SLVIA Figures Part 7 of 3401May 2024
5.3.18.8APP-113Chapter 18 SLVIA Figures Part 8 of 3401May 2024
5.3.18.9APP-114Chapter 18 SLVIA Figures Part 9 of 3401May 2024
5.3.18.10APP-115Chapter 18 SLVIA Figures Part 10 of 3401May 2024
5.3.18.11APP-116Chapter 18 SLVIA Figures Part 11 of 3401May 2024
5.3.18.12APP-117Chapter 18 SLVIA Figures Part 12 of 3401May 2024
5.3.18.13APP-118Chapter 18 SLVIA Figures Part 13 of 3401May 2024
5.3.18.14APP-119Chapter 18 SLVIA Figures Part 14 of 3401May 2024
5.3.18.15APP-120Chapter 18 SLVIA Figures Part 15 of 3401May 2024
5.3.18.16APP-121Chapter 18 SLVIA Figures Part 16 of 3401May 2024
5.3.18.17APP-122Chapter 18 SLVIA Figures Part 17 of 3401May 2024
5.3.18.18APP-123Chapter 18 SLVIA Figures Part 18 of 3401May 2024
5.3.18.19APP-124Chapter 18 SLVIA Figures Part 19 of 3401May 2024
5.3.18.20APP-125Chapter 18 SLVIA Figures Part 20 of 3401May 2024
5.3.18.21APP-126Chapter 18 SLVIA Figures Part 21 of 3401May 2024
5.3.18.22APP-127Chapter 18 SLVIA Figures Part 22 of 3401May 2024
5.3.18.23APP-128Chapter 18 SLVIA Figures Part 23 of 3401May 2024
5.3.18.24APP-129Chapter 18 SLVIA Figures Part 24 of 3401May 2024
5.3.18.25APP-130Chapter 18 SLVIA Figures Part 25 of 3401May 2024
5.3.18.26APP-131Chapter 18 SLVIA Figures Part 26 of 3401May 2024
5.3.18.27APP-132Chapter 18 SLVIA Figures Part 27 of 3401May 2024
5.3.18.28APP-133Chapter 18 SLVIA Figures Part 28 of 3401May 2024
5.3.18.29APP-134Chapter 18 SLVIA Figures Part 29 of 3401May 2024
5.3.18.30APP-135Chapter 18 SLVIA Figures Part 30 of 3401May 2024
5.3.18.31APP-136Chapter 18 SLVIA Figures Part 31 of 3401May 2024
5.3.18.32APP-137Chapter 18 SLVIA Figures Part 32 of 3401May 2024
5.3.18.33APP-138Chapter 18 SLVIA Figures Part 33 of 3401May 2024
5.3.18.34APP-139Chapter 18 SLVIA Figures Part 34 of 3401May 2024
5.3.19APP-140Chapter 19 Human Health Figures01May 2024
5.3.20APP-141Chapter 20 Socio-economics Tourism and Recreation Figures01May 2024
5.3.23APP-142Chapter 23 Summary Generation and Transmission Assets Assessment Figures01May 2024
5.4APP-143Scoping Report and Scoping Opinion01May 2024
5.5AS-016Schedule of Mitigation07April 2025
9.44REP3-073Impact Assessment of Proposed Morecambe Bay Windfarm Against Selected Instrument Flight Procedures01January 2025
9.66REP6-037VHF, UHF, and DF Technical Safeguarding Assessment02April 2025
Outline plans and documents
6.2REP5a-023Outline Project Environmental Management Plan05April 2025
6.3REP5a-025Outline Fisheries Liaison and Co-Existence Plan05April 2025
6.4REP6-017In Principle Monitoring Plan06April 2025
6.5REP6‑019Draft Marine Mammal Mitigation Protocol06April 2025
6.6REP5-030Outline Offshore Operation and Maintenance Plan03March 2025
6.7REP5-032Outline Port Access and Transport Plan02March 2025
6.8REP5-034Outline Scour Protection and Cable Protection Plan03March 2025
6.9REP5a-031Outline Vessel Traffic Management Plan05April 2025
6.10REP5-038Outline Offshore Written Scheme of Investigation02March 2025
6.11REP5-040Outline Skills and Employment Plan02March 2025
9.32REP5a-042Outline Underwater Sound Management Strategy04April 2025
9.49REP6-034Outline Construction Method Statement03April 2025
10.3.1C1-011Appendix C: The Applicant’s Response to Question 20 - Harbour Energy - Agreed Protective Provisions (Harbour Protective Provisions Plan only)01September 2025
10.4.1C5-002aAppendix A.2: Agreed Protective Provisions Plans01November 2025