Paragraph 15 Construction monitoringI1

England, Wales and Scotland

(1)

The undertaker must, in discharging condition 9(1)(c), submit details (which accord with the in principle monitoring plan) for approval by the MMO in consultation with the relevant statutory nature conservation body of any proposed construction monitoring, including methodologies and timings, to be carried out during the construction of the authorised project. The monitoring proposals must specify each monitoring proposal’s objectives.

(2)

In the event that driven or part-driven pile foundations are proposed, such monitoring must include measurements of underwater sound generated by the installation of the first four piled foundations of each piled foundation type to be installed unless the MMO otherwise agrees.

(3)

The undertaker must carry out the monitoring approved under sub-paragraph (1), including any further underwater sound monitoring required by the MMO, and provide the agreed reports in the agreed format in accordance with the agreed timetable.

(4)

The results of the initial underwater sound measurements monitored in accordance with sub- paragraph (2) must be provided to the MMO within six weeks of the end of piling of the first four piled foundations. The assessment of this report by the MMO will determine whether any further underwater sound monitoring is required. If, in the reasonable opinion of the MMO in consultation with the relevant statutory nature conservation body, the assessment shows significantly different impacts to those assessed in the environmental statement or failures in mitigation, all piling activity must cease until an update to the marine mammal mitigation protocol and further monitoring requirements have been agreed.

(5)

The undertaker must carry out the surveys specified in the monitoring plan approved under condition 9(1)(c) in accordance with that plan, including any further underwater sound monitoring required by the MMO under sub-paragraph (4).

(6)

Construction monitoring must include vessel traffic monitoring in accordance with the in principle monitoring plan, including the provision of reports on the results of that monitoring at the end of each year of the construction period to the MMO, MCA and Trinity House.

(7)

In the event that piled foundations are proposed to be used, the details submitted in accordance with the marine mammal mitigation protocol must include proposals for monitoring marine mammals to ensure the ongoing efficacy of the marine mammal mitigation protocol.

Annotations

Commencement

I1

Sch. 6 Pt. 2 para. 15 in force at 23.12.2025, see art. 1