Part 2 STREETS SUBJECT TO TEMPORARY ALTERATION OF LAYOUTI1

England and Wales

SUFFOLK COUNTY COUNCIL

(1)

Street subject to alteration of layout

(2)

Description of alteration of layout as shown on the Access, Rights of Way and Public Rights of Navigation Plans

Bullen LaneAt access point AB-AP1 a temporary bellmouth will be created (as shown on Sheet 1) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Burstall HillAt access points AB-AP2A and AB-AP2B, two temporary bellmouths will be created (as shown on Sheets 1 and 2) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Church HillAt access point AB-AP3, AB-AP4, AB-AP5, three temporary bellmouths will be created (as shown on Sheet 2) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
A1071 (Back Road)At access points AB-AP6, AB-AP7, AB-AP8, AB-EAP1 and AB-EAP2a, five temporary bellmouths will be created (as shown on Sheets 3 and 6) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
A1071 (Ipswich Road)At access point AB-EAP2b a temporary bellmouth will be created (as shown on Sheet 6) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
A1071 (Hadleigh Road)At access point AB-DAP1 a temporary bellmouth will be created (as shown on Sheet 4) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Washbrook RoadAt access points AB-DAP2, AB-DAP3, two temporary bellmouths will be created (as shown on Sheet 4) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Lower Barn RoadAt access point AB-DAP4 a temporary bellmouth will be created (as shown on Sheet 5) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Mill LaneAt access point AB-DAP5 a temporary bellmouth will be created (as shown on Sheet 5) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Duke StreetAt access point AB-DAP6 a temporary bellmouth will be created (as shown on Sheet 7) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Clay HillAt access point AB-DAP7 a temporary bellmouth will be created (as shown on Sheet 7) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Pond Hall RoadAt access points AB-DAP8, AB-AP9, AB-AP11, AB-AP12, AB-AP13, AB-AP14, AB-AP17, seven temporary bellmouths will be created (as shown on Sheets 7 to 9) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Woodlands RoadAt access point AB-DAP9 a temporary bellmouth will be created (as shown on Sheet 8) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Clay LaneAt access points AB-DAP10, AB-AP15, AB-AP16, three temporary bellmouths will be created (as shown on Sheet 8) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
B1070 (Pipkin Hill)At access points C-AP1 and C-AP2, two temporary bellmouths will be created (as shown on Sheet 10) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
B1070 (The Street)At access point C-DAP1 a temporary bellmouth will be created (as shown on Sheet 10) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Layham RoadAt access points C-AP3, C-AP4, two temporary bellmouths will be created (as shown on Sheet 10) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Overbury Hall RoadAt access points C-AP5, D-AP1, two temporary bellmouths will be created (as shown on Sheet 11) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Rands RoadAt access points D-DAP1, D-AP2, two temporary bellmouths will be created (as shown on Sheet 11) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Millwood RoadAt access points D-AP3, D-AP4, two temporary bellmouths will be created (as shown on Sheet 12) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Heath RoadAt access points D-AP6, D-AP7, D-DAP2A, D-DAP3, four temporary bellmouths will be created (as shown on Sheet 12) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Holt RoadAt access points D-AP8, E-AP1, two temporary bellmouths will be created (as shown on Sheet 13) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Whitestreet GreenAt access points E-AP4, E-AP5, E-AP6, E-DAP2, E-DAP3, five temporary bellmouths will be created (as shown on Sheets 13 and 14) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Brick Kiln HillAt access points E-AP8, F-DAP1, two temporary bellmouths will be created (as shown on Sheet 15) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
B1068 (Stoke Road)At access points E-AP7, E-DAP4, E-DAP5, F-AP1 and at points BM-1 and BM-2, six temporary bellmouths will be created (as shown on Sheet 15) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required. Note: points BM-1 and BM-2 have no associated construction traffic, they are only used as crossing points.
Colchester Road (A134)At access points F-AP5, F-AP6, F-AP7, F-DAP2, four temporary bellmouths will be created (as shown on Sheets 15 and 16) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Nayland RoadAt access points F-AP8, F-AP9, F-DAP3, three temporary bellmouths will be created (as shown on Sheet 16) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Bures RoadAt access points F-AP10, F-AP12, F-AP13, F-DAP4, F-DAP5, five temporary bellmouths will be created (as shown on Sheet 17) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Wormingford RoadAt access point F-AP11 a temporary bellmouth will be created (as shown on Sheet 17) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Dorking TyeAt access points F-AP14, G-AP1, G-AP2 three temporary bellmouths will be created (as shown on Sheets 17) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
B1508 (St Edmunds Hill)At access points G-AP4, G-DAP1, G-DAP2, three temporary bellmouths will be created (as shown on Sheet 20) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.

ESSEX COUNTY COUNCIL

(1)

Street subject to alteration of layout

(2)

Description of alteration of layout as shown on the Access, Rights of Way and Public Rights of Navigation Plans

Henny RoadAt access points G-AP5, G-AP6, G-DAP3, G-DAP4, four temporary bellmouths will be created (as shown on Sheet 20) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Losh House LaneAt access points G-AP9, G-AP13, two temporary bellmouths will be created (as shown on Sheet 21) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Twinstead RoadAt access points G-DAP5, G-DAP6, G-DAP7, G-DAP8, four temporary bellmouths will be created (as shown on Sheets 21 and 27) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Lorkin’s LaneAt access point G-AP10 a temporary bellmouth will be created (as shown on Sheets 21 and 27) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Clay HillAt access point G-YLAP3 a temporary bellmouth will be created (as shown on Sheet 22) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Church RoadAt access point G-YLAP4 a temporary bellmouth will be created (as shown on Sheet 22) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Watery LaneAt access point G-YLAP5 a temporary bellmouth will be created (as shown on Sheet 22) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Rectory LaneAt access point H-YLAP2 a temporary bellmouth will be created (as shown on Sheet 24) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Church RoadAt access points H-YLAP3, H-YLAP4, two temporary bellmouths will be created (as shown on Sheet 24) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Hedingham RoadAt access points H-YLAP5, H-YLAP6, two temporary bellmouths will be created (as shown on Sheet 24) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Old RoadAt access points H-AP3, H-AP4, H-AP5, H-AP6, H-AP7, H-YLAP1, six temporary bellmouths will be created (as shown on Sheets 23 and 26) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Park RoadAt access point H-AP8 a temporary bellmouth will be created (as shown on Sheet 26) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Moat LaneAt access points G-AP7, G-AP8, two temporary bellmouths will be created (as shown on Sheet 27) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Henny Back RoadAt access points G-AP11, G-AP12, G-AP15, H-AP10, H-AP11, five temporary bellmouths will be created (as shown on Sheet 28) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Whitelands RoadAt access points H-AP12, H-AP13, H-AP16 and H-AP17, four temporary bellmouths will be created (as shown on Sheet 29) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Lorkin’s LaneAt access points H-AP14, H-AP15, two temporary bellmouths will be created (as shown on Sheet 29) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Oak RoadAt access points H-AP18, H-AP19, two temporary bellmouths will be created (as shown on Sheet 29) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.
Sudbury Road (A131)At access point H-AP20 a temporary bellmouth will be created (as shown on Sheet 30) to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, road markings, kerbing and a suitable drainage system, where required.

Annotations

Commencement

I1