Paragraph 13 Bird flight diverters
Bird flight diverters must be fitted to the 400kV overhead line in the vicinity of—
the River Brue between pylons LD8 and LD11;
the Huntspill River between pylons LD2 and LD5; and
the King’s Sedgemoor Drain between pylons ZGA1 and ZGA3,
during its construction and must thereafter be retained, unless otherwise agreed by the relevant planning authority, after consultation with Natural England.
Post construction bird collision monitoring of the 400kV overhead line must be undertaken in accordance with the requirements set out in Document 5.33.1 (for the area south of Mark).
When the first of the following has occured—
Commencement of enhancement works for waders and wildfowl have commenced across 9.5ha of land at Hallen Marsh (as measured by the total area of the wetland creation project which includes scrapes for wading birds or ponds for waterfowl and the surrounding land);
The creation of at least 100m2 of scrapes or ponds at Hallen Marsh,
National Grid must install large spiral bird diverters on the earth wire between pylons LD125 and LD129 at the next available outage. If the first of (a) or (b) is reached prior to or during the construction of the authorised development, the diverters must be installed during the construction of the overhead lines, or if after energisation of the lines, at the first available outage.