Schedule 3 REQUIREMENTS
- 1Interpretation
- 2Time limits
- 3Design drawings
- 4Stages of authorised development
- 5Construction Environmental Management Plan
- 6Approval and implementation of construction mitigation plans
- 7Construction hours
- 8Control of artificial light emissions
- 9Provision of embedded landscape mitigation and landscaping schemes
- 10Replacement planting
- 11Implementation of landscaping and replacement planting
- 12Retention and protection of existing trees and hedgerows
- 13Bird flight diverters
- 14Bat mitigation measures
- 15Reinstatement schemes
- 16Fencing and other means of enclosure
- 17Surface water drainage
- 18Contaminated land and groundwater
- 19Inspection of temporary watercourses
- 20Removal of temporary bridges and culverts
- 21Accumulation and deposits
- 22Highway works
- 23HGV traffic
- 24Scheme of marking
- 25Highway signage plans
- 26Traffic Incident Management Plan
- 27Travel Plan
- 28Seabank substation flood defences
- 29Control of operational noise at Sandford substation
- 30River Axe crossing
- 31Residential amenity: information dissemination and complaints handling
- 32Approval of external appearances etc. of permanent structures
- 33Clearance over main rivers
- 34Decommissioning
- 35Removal of WPD Works
- 36Colour of T-pylons
- 37Construction compounds
- 38Design Approach to Site Specific Infrastructure
- 39Overhead line conductors
- 40Assessment of noise impacts
- 41Assessment of vibration impacts
- 42St Anthony’s Park travellers’ site
- 43Site Specific Mitigation Scheme
- 44Bat Special Areas of Conservation
- 45England Coast path
- 46Avonmouth Sewage Treatment Works