Paragraph 18 Removal of UK Power Networks WorksI1

England and Wales

Any existing UK Power Networks infrastructure to be removed as part of the UK Power Networks works must be removed no later than 36 months after the 400kV overhead line (Work No.1 of Schedule 1 (authorised development)) is first brought into operational use.