Paragraph 18 Approval of details having regard to the Design Approach to Site Specific InfrastructureI1

England, Wales and Scotland

(1)

Any permanent buildings (including relocated buildings) and the acoustic enclosures at—

(a)

Overton Substation; and

(b)

Monk Fryston Substation,

must not be commenced until details of the external colour and surface finish of the permanent buildings and the external colour of the acoustic enclosures have been submitted to and approved by the relevant planning authority.

F1(2)

Any permanent site security fencing for a non-linear work at

(a)

Shipton Tee Cable Sealing End Compounds;

(b)

Overton Substation;

(c)

Tadcaster Tee Cable Sealing End Compounds; and

(d)

Monk Fryston Substation,

must not be commenced until details of the colour or type of the fencing, which must comply with Technical Specification TS2.10.02 Perimeter Security, has been submitted to and approved by the relevant planning authority.

(3)

Any details to be approved F2under paragraphs (1) and (2) must be produced having regard to the design approach to site specific infrastructure and must be implemented as approved.

Annotations

Textual amendments

F1

Words in Sch. 3 para. 18(2) substituted (12.6.2024) by The National Grid (Yorkshire Green Energy Enablement Project) (Corrections) Order 2024 (S.I. 2024/811), art. 1, Sch. 1

F2

Words in Sch. 3 para. 18(3) substituted (12.6.2024) by The National Grid (Yorkshire Green Energy Enablement Project) (Corrections) Order 2024 (S.I. 2024/811), art. 1, Sch. 1

Commencement

I1

Sch. 3 para. 18 in force at 5.4.2024, see art. 1