Schedule 3 REQUIREMENTS

England, Wales and Scotland

  1. 1Interpretation
  2. 2Time limits
  3. 3Design drawings
  4. 4Stages of authorised development
  5. 5Construction management plans
  6. 6Construction management plans to be approved
  7. 7Construction hours
  8. 8Landscaping at Overton, Tadcaster and Monk Fryston
  9. 9Retention and protection of existing trees
  10. 10Replacement planting
  11. 11Reinstatement schemes
  12. 12Contamination of land or groundwater and controlled waters
  13. 13Removal of temporary bridges and culverts
  14. 14Highway works
  15. 15Removal of existing overhead line
  16. 16Decommissioning
  17. 17Clearance over the River Ouse
  18. 18Approval of details having regard to the Design Approach to Site Specific Infrastructure
  19. 19Site specific mitigation scheme