OpenLegislation

Paragraph 89 I1

England, Wales and Scotland

In this Part of this Schedule—

  • “Exolum” means Exolum Seal Sands Ltd (Company number 00465548) and Exolum Riverside Ltd (Company number 03422427), both of whose registered address is 1st Floor 55 King William Street, London EC4R 9AD and any successor in function to Exolum’s operations;

  • “the Exolum operations” means the operations and assets within the Order limits or operations and assets which have the benefit of rights (including access) over the Order limits vested in Exolum including the pipeline crossing the Order limits operated by Exolum used at all times and all ancillary apparatus including such works and apparatus properly appurtenant to the pipelines as are specified by section 65(2) (meaning of “pipe-line”) of the Pipe-lines Act 1962;

  • “restricted works” means any works forming any part of the authorised development that are near to, or will or may affect the Exolum operations or access to them including—

    1. (a)

      all works within 15 metres of the Exolum operations;

    2. (b)

      the crossing of the Exolum operations by other utilities;

    3. (c)

      the use of explosives within 400 metres of the Exolum operations; and

    4. (d)

      piling, undertaking of a 3D seismic survey or the sinking boreholes within 30 metres of the Exolum operations,

    whether carried out by the undertaker or any third party in connection with the authorised development; and

  • “works details” means—

    1. (a)

      plans and sections;

    2. (b)

      a method statement describing—

      1. (i)

        the exact position of the works;

      2. (ii)

        the level at which the works are proposed to be constructed or renewed;

      3. (iii)

        the manner of the works’ construction or renewal including details of excavation, positioning of plant etc.;

      4. (iv)

        the position of all apparatus;

      5. (v)

        by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus;

      6. (vi)

        any intended maintenance regime;

      7. (vii)

        details of the proposed method of working and timing of execution of works;

      8. (viii)

        details of vehicle access routes for construction and operational traffic; and

      9. (ix)

        any other information reasonably required by Exolum to assess the works;

    3. (c)

      where the restricted works will or may be situated on, over, under or within 15 metres measured in any direction of the Exolum operations, or (wherever situated) impose any load directly upon the Exolum operations or involve embankment works within 15 metres of the Exolum operations, the method statement must also include—

      1. (i)

        the position of the Exolum operations; and

      2. (ii)

        by way of detailed drawings, every alteration proposed to be made to the Exolum operations; and

    4. (d)

      any further particulars provided in response to a request under paragraph 90.

Annotations

Commencement

I1

Sch. 12 para. 89 in force at 11.3.2024, see art. 1