Schedule 5 STREETS TO BE STOPPED UPI1
England, Wales and Scotland
(1) Area | (2) Street to be stopped up | (3) Extent of stopping up | (4) New Street to be substituted |
|---|---|---|---|
| Doncaster Metropolitan Borough | Joan Croft Lane | Road over Joan Croft Level Crossing and south east section of Joan Croft Lane between points V and W. | New access to be provided over new highway bridge over railway (Work No.8) between points S and U via point T. |
| Farm access over Honey Lands Lane level crossing and Footpath 11 south to Honey Lands Lane. | Stopping up of farm access between points 1, 2 and 3. Stopping up of Footpath 11 between points 2 and 2a. | New farm access and footpath to be provided between point 1 and point 4, between point 4 and point 5 and between point 5 and point 3. | |
| Honey Lands Lane at junction with Joan Croft Lane | Close bridleway 13 between points 6 and 7. | Proposed new bridleway to be created between point 6 and point 8. |
Annotations
Commencement
- I1
Sch. 5 in force at 6.11.2012, see art. 1