Article 8 Power to deviateI1
England, Wales and Scotland
In constructing or maintaining any of the scheduled works, Network Rail may—
(a)
deviate laterally from the lines or situations shown on the works plans to the extent of the limits of deviation for that work; and
(b)
deviate vertically from the levels shown on the sections—
(i)
to any extent upwards not exceeding 0.5 metres in relation to Works Nos. 1 to 3 and 3 metres in relation to Works Nos. 4 and 5; or
(ii)
to any extent downwards as may be found to be necessary or convenient.
Annotations
Commencement
- I1
Art. 8 in force at 21.4.2015, see art. 1