Paragraph 45 I1
England, Wales and Scotland
Where so required by the engineer Network Rail must to the reasonable satisfaction of the engineer fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the waterway, whether on a temporary or permanent basis.
Annotations
Commencement
- I1
Sch. 12 para. 45 in force at 21.4.2015, see art. 1