Paragraph
The conveying system and the pipe shall be filled with a medium similar to concrete, the cement being replaced by an admixture e.g. finest ash. The machine shall operate at its maximum output, the period of one working cycle being not more than five seconds (if this period is exceeded, water shall be added to the “concrete" in order to reach this value).
(ii)
For machines conveying and spraying mortar:
Notes on the whole SI
Textual amendments
- F1
- F2
Notes on Schedule 6
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only