OpenLegislation

Paragraph

The conveying system and the pipe shall be filled with a medium similar to finishing mortar, the cement being replaced by an admixture, e.g. methyl cellulose. The machine shall operate at its maximum output, the period of one working cycle being not more than five seconds (if this period is exceeded, water shall be added to the “mortar" in order to reach this value).

Notes on the whole SI

Textual amendments

F1

S.I. 2000/3238.

F2

1972 c. 68.

Notes on Schedule 6

Extent

E1

This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only