Paragraph 2 Design parametersI1
England and Wales
The total length of the cables and the area and volume of their cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—
| Work | Length | Cable protection (m3) | Cable protection (m2) |
|---|---|---|---|
| Work No. 3A (Interconnector link) | 90 kilometres | 17,000 m3 | 34,000 m2 |
| Work No. 4A and 4B (export cable) | 500 kilometres | 69,236m3 | 124,086m2 |
Annotations
Commencement
- I1
Sch. 11 Pt. 4 para. 2 in force at 1.1.2022, see art. 1