Paragraph 2 Design parametersI1

England and Wales

The total length of cables and volume of cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—

WorkLengthCable protection (m3)Cable protection (m2)
Work No. 3B (Project interconnection)180 kilometres41,000 m374,000 m2