Paragraph 2 Design parametersI1
England and Wales
The total length of cables and volume of cable protection must not exceed the individual distributions set out in Table 2 of the outline scour protection and cable protection plan and must not exceed the following—
| Work | Length | Cable protection (m3) | Cable protection (m2) |
|---|---|---|---|
| Work No. 3B (Project interconnection) | 180 kilometres | 41,000 m3 | 74,000 m2 |