Paragraph 17 Landfall method statementI1
England, Wales and Scotland
No part of Work Nos. 4A, 4B or 4C may commence until a method statement for the construction of Work Nos. 4A, 4B and 4C has been submitted to and approved in writing by North Norfolk District Council in consultation with Natural England.
The method statement referred to in paragraph (1) must include measures for long horizontal directional drilling below the coastal shore platform and cliff base at the landfall as well as measures for ongoing inspection of Work No. 4C and reporting of results to North Norfolk District Council during the operation of the authorised project.
In the event that inspections indicate that as a result of the rate and extent of landfall erosion Work No. 4C could become exposed during the operation of the authorised project the undertaker must, as soon as practicable, submit proposals in writing for remedial measures to protect Work No. 4C, together with a timetable for their implementation, to North Norfolk District Council for their approval, in consultation with Natural England.
The method statement and any proposals for remedial measures must be implemented as approved.
Annotations
Commencement
- I1
Sch. 1 para. 17 in force at 5.3.2022, see art. 1