The Norfolk Vanguard Offshore Wind Farm Order 2022

S.I. 2022/138 · Made 11 February 2022 · Extends to England, Wales and Scotland

Up to date with all changes known to legislation.gov.uk, revised to 19 December 2025.

Infrastructure Planning

Made 11th February 2022

Coming into force 5th March 2022

An application has been made to the Secretary of State under section 37 of the Planning Act 2008 (“the 2008 Act”)(f1) and in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009f2 for an order granting development consent.

The application was examined by the Examining Authority appointed by the Secretary of State pursuant to sections 61f3 and 65f4 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of that Act and with the Infrastructure Planning (Examination Procedure) Rules 2010f5. The Examining Authority has submitted a report to the Secretary of State under section 74(2)f6 of the 2008 Act.

The Secretary of State has considered the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 3 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009f7 and, as a national policy statement has effect in relation to the proposed development, has had regard to the documents and matters referred to in section 104(2)f8 of the 2008 Act.

The Secretary of State, having decided the application, has determined to make an Order granting development consent for the development described in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.

The Secretary of State is satisfied that open space comprised within the Order land, when burdened with the new rights authorised for compulsory acquisition under the terms of this Order, will be no less advantageous than it was before such acquisition, to the persons in whom it is vested, other persons, if any, entitled to rights of common or other rights, and the public and that, accordingly, section 132(3)f9 of the 2008 Act applies.

The Secretary of State in exercise of the powers conferred by sections 114, 115, 120f10, 140 and 149A of the 2008 Act makes the following Order—

Annotations to the whole text

Footnotes

f1

2008 c. 29. Section 37 was amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20).

f2

S.I. 2009/2264.

f3

Section 61 was amended by section 128(2) and Schedule 13, paragraph 18 to the Localism Act 2011 (c. 20) and by section 26 of the Infrastructure Act 2015 (c. 7).

f4

Section 65 was amended by Schedule 13 paragraph 22(2) and Schedule 25, paragraph 1 to the Localism Act 2011 and by section 27(1) of the Infrastructure Act 2015 (c. 7).

f5

S.I. 2010/103, amended by S.I. 2012/635.

f6

Section 74 was amended by sections 128(2) and 237 and by Schedule 13, paragraph 29 and Schedule 25, paragraph 1, to the Localism Act 2011 (c. 20).

f7

S.I. 2009/2263. Regulation 3 was amended by S.I. 2012/635 and S.I. 2012/787. S.I. 2009/2263 was revoked by S.I. 2017/572, but continues to apply to this application for development consent by virtue of transitional provisions contained in regulation 37(2) of that instrument.

f8

Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 (c. 20).

f9

Section 132 was amended by section 24(3) of the Growth and Infrastructure Act 2013 (c. 27).

f10

Sections 114,115 and 120 were amended by sections 128(2) and 140 and Schedule 13, paragraphs 1, 55(1), (2) and 60(1) and (3) of the Localism Act 2011 (c. 20). Relevant amendments were made to section 115 by section 160(1) to (6) of the Housing and Planning Act 2016 (c. 22).

Contents

  1. Part 1: Preliminary
  2. 1Citation and commencement
  3. 2Interpretation
  4. Part 2: Principal Powers
  5. 3Development consent etc. granted by the Order
  6. 4Limits of deviation
  7. 5Power to maintain authorised project
  8. 6Benefit of the Order
  9. 7Application and modification of legislative provisions
  10. 8Defence to proceedings in respect of statutory nuisance
  11. Part 3: Streets
  12. 9Street works
  13. 10Public rights of way
  14. 11Temporary stopping up of streets
  15. 12Access to works
  16. 13Agreements with street authorities
  17. 14Application of the 1991 Act
  18. Part 4: Supplemental Powers
  19. 15Discharge of water and works to watercourses
  20. 16Authority to survey and investigate the land onshore
  21. 17Removal of human remains
  22. Part 5: Powers of Acquisition
  23. 18Compulsory acquisition of land
  24. 19Time limit for exercise of authority to acquire land compulsorily
  25. 20Compulsory acquisition of rights and the imposition of restrictive covenants
  26. 21Private rights
  27. 22Application of the 1981 Act
  28. 23Application of Part 1 of the 1965 Act
  29. 24Acquisition of subsoil or airspace only
  30. 25Rights under or over streets
  31. 26Temporary use of land for carrying out the authorised project
  32. 27Temporary use of land for maintaining authorised project
  33. 28Extinguishment of private rights and restrictive covenants relating to apparatus removed from land subject to temporary possession
  34. 29Statutory undertakers
  35. 30Recovery of costs of new connections
  36. Part 6: Operations
  37. 31Operation of generating station
  38. 32Deemed marine licences under the 2009 Act
  39. Part 7: Miscellaneous and General
  40. 33Application of landlord and tenant law
  41. 34Operational land for purposes of the 1990 Act
  42. 35Felling or lopping of trees and removal of hedgerows
  43. 36Trees subject to tree preservation orders
  44. 37Certification of plans etc
  45. 38Arbitration
  46. 39Procedure in relation to certain approvals etc
  47. 40Abatement of works abandoned or decayed
  48. 41Saving provisions for Trinity House
  49. 42Crown rights
  50. 43Service of Notices
  51. 44Protective provisions
  52. 45Compensation to protect the coherence of the national site network
  53. Signature
  54. Schedule 1: Authorised Project
  55. 1Authorised Development
  56. 1Paragraph 1
  57. 2Paragraph 2
  58. Part 2: Ancillary Works
  59. 1Paragraph 1
  60. Part 3: Requirements
  61. 1Time limits
  62. 2Detailed offshore design parameters
  63. 3Detailed offshore design parameters
  64. 4Detailed offshore design parameters
  65. 5Detailed offshore design parameters
  66. 6Detailed offshore design parameters
  67. 7Detailed offshore design parameters
  68. 8Detailed offshore design parameters
  69. 9Detailed offshore design parameters
  70. 10Detailed offshore design parameters
  71. 11Detailed offshore design parameters
  72. 12Aviation safety
  73. 13Ministry of Defence surveillance operations
  74. 14Offshore decommissioning
  75. 15Stages of authorised development onshore
  76. 16Detailed design parameters onshore
  77. 17Landfall method statement
  78. 18Provision of landscaping
  79. 19Implementation and maintenance of landscaping
  80. 20Code of construction practice
  81. 21Traffic
  82. 22Highway accesses
  83. 23Archaeological written scheme of investigation
  84. 24Ecological management plan
  85. 25Watercourse crossings
  86. 26Construction hours
  87. 27Control of noise during operational phase and during maintenance
  88. 28European protected species onshore
  89. 29Onshore decommissioning
  90. 30Requirement for written approval
  91. 31Amendments to approved details
  92. 32Operational drainage plan
  93. 33Skills and employment strategy
  94. 34Cromer Primary Surveillance Radar
  95. Schedule 2Streets subject to Street Works
  96. Schedule 3Public Rights of Way to be temporarily stopped up
  97. Schedule 4Streets to be stopped up
  98. Schedule 5Access to Works
  99. Schedule 6Land in which only New Rights etc., may be acquired
  100. Schedule 7: Modification of compensation and compulsory purchase enactments for creation of new rights
  101. 1Paragraph 1
  102. 2Paragraph 2
  103. 3Paragraph 3
  104. 4Paragraph 4
  105. 5Paragraph 5
  106. 6Paragraph 6
  107. 7Paragraph 7
  108. 8Paragraph 8
  109. 9Paragraph 9
  110. 10Paragraph 10
  111. Schedule 8Land of which temporary possession may be taken
  112. Schedule 9: Deemed Licence under the 2009 Act – Generation Assets (Licence 1 – Phase 1)
  113. Part 1: Interpretation
  114. 1Paragraph 1
  115. 2Paragraph 2
  116. 3Paragraph 3
  117. 4Paragraph 4
  118. Part 2: Licensed Marine Activities – General
  119. 1Paragraph 1
  120. 2Paragraph 2
  121. 3Paragraph 3
  122. 4Paragraph 4
  123. 5Paragraph 5
  124. 6Paragraph 6
  125. Part 3: Details of Licensed Marine Activities
  126. 1Paragraph 1
  127. 2Paragraph 2
  128. Part 4: Conditions
  129. 1Design parameters
  130. 2Design parameters
  131. 3Design parameters
  132. 4Design parameters
  133. 5Design parameters
  134. 6Design parameters
  135. 7Design parameters
  136. 8Phasing of the authorised scheme
  137. 9Notifications and inspections
  138. 10Aids to navigation
  139. 11Colouring of structures
  140. 12Chemicals, drilling and debris
  141. 13Force majeure
  142. 14Pre-construction plans and documentation
  143. 15Pre-construction plans and documentation
  144. 16Post-construction plans and documents
  145. 17Reporting of engaged agents, contractors and vessels
  146. 18Pre-construction monitoring and surveys
  147. 19Construction monitoring
  148. 20Post construction
  149. 21Reporting of impact pile driving
  150. 22Reporting of scour and cable protection
  151. 23Completion of construction
  152. Schedule 10: Deemed Licence under the 2009 Act – Generation Assets (Licence 2 – Phase 2)
  153. Part 1: Interpretation
  154. 1Paragraph 1
  155. 2Paragraph 2
  156. 3Paragraph 3
  157. 4Paragraph 4
  158. Part 2: Licensed Marine Activities – General
  159. 1Paragraph 1
  160. 2Paragraph 2
  161. 3Paragraph 3
  162. 4Paragraph 4
  163. 5Paragraph 5
  164. 6Paragraph 6
  165. Part 3: Details of Licensed Marine Activities
  166. 1Paragraph 1
  167. 2Paragraph 2
  168. Part 4: Conditions
  169. 1Design parameters
  170. 2Design parameters
  171. 3Design parameters
  172. 4Design parameters
  173. 5Design parameters
  174. 6Design parameters
  175. 7Design parameters
  176. 8Phasing of the authorised scheme
  177. 9Notifications and inspections
  178. 10Aids to navigation
  179. 11Colouring of structures
  180. 12Chemicals, drilling and debris
  181. 13Force majeure
  182. 14Pre-construction plans and documentation
  183. 15Pre-construction plans and documentation
  184. 16Post-construction plans and documents
  185. 17Reporting of engaged agents, contractors and vessels
  186. 18Pre-construction monitoring and surveys
  187. 19Construction monitoring
  188. 20Post construction
  189. 21Reporting of impact pile driving
  190. 22Reporting of cable and scour protection
  191. 23Completion of construction
  192. Schedule 11: Deemed Licence under the 2009 Act – Transmission Assets (Licence 1 – Phase 1)
  193. Part 1: Interpretation
  194. 1Paragraph 1
  195. Part 2: Licensed Marine Activities – General
  196. 1Paragraph 1
  197. 2Paragraph 2
  198. 3Paragraph 3
  199. 4Paragraph 4
  200. 5Paragraph 5
  201. 6Paragraph 6
  202. Part 3: Details of Licensed Marine Activities
  203. 1Paragraph 1
  204. 2Paragraph 2
  205. Part 4: Conditions
  206. 1Design parameters
  207. 2Design parameters
  208. 3Phasing of the authorised scheme
  209. 4Notifications and inspections
  210. 5Aids to navigation
  211. 6Colouring of structures
  212. 7Chemicals, drilling and debris
  213. 8Force majeure
  214. 9Pre-construction plans and documentation
  215. 10Pre-construction plans and documentation
  216. 11Post-construction plans and documents
  217. 12Reporting of engaged agents, contractors and vessels
  218. 13Pre-construction monitoring and surveys
  219. 14Construction monitoring
  220. 15Post construction
  221. 16Reporting of impact pile driving
  222. 17Reporting of scour and cable protection
  223. 18Restriction on cable installation construction works
  224. Schedule 12: Deemed Licence under the 2009 Act – Transmission Assets (Licence 2 – Phase 2)
  225. Part 1: Interpretation
  226. 1Paragraph 1
  227. Part 2: Licensed Marine Activities – General
  228. 1Paragraph 1
  229. 2Paragraph 2
  230. 3Paragraph 3
  231. 4Paragraph 4
  232. 5Paragraph 5
  233. 6Paragraph 6
  234. Part 3: Details of Licensed Marine Activities
  235. 1Paragraph 1
  236. 2Paragraph 2
  237. Part 4: Conditions
  238. 1Design parameters
  239. 2Design parameters
  240. 3Phasing of the authorised scheme
  241. 4Notifications and inspections
  242. 5Aids to navigation
  243. 6Colouring of structures
  244. 7Chemicals, drilling and debris
  245. 8Force majeure
  246. 9Pre-construction plans and documentation
  247. 10Pre-construction plans and documentation
  248. 11Post-construction plans and documents
  249. 12Reporting of engaged agents, contractors and vessels
  250. 13Pre-construction monitoring and surveys
  251. 14Construction monitoring
  252. 15Post construction
  253. 16Reporting of impact pile driving
  254. 17Reporting of cable protection
  255. 18Restriction on cable installation construction works
  256. Schedule 13: Hedgerows
  257. 1Removal of Potentially Important Hedgerows
  258. 2Removal of Important Hedgerows
  259. 3Removal of Hedgerows
  260. Schedule 14: Arbitration Rules
  261. 1Primary objective
  262. 2Time periods
  263. 3Timetable
  264. 4Procedure
  265. 5Arbitrator’s powers
  266. 6Costs
  267. 7Confidentiality
  268. Schedule 15: Procedure for discharge of Requirements
  269. 1Applications made under requirement
  270. 2Further information
  271. 3Appeals
  272. 4Interpretation of this Schedule
  273. Schedule 16: Protective Provisions
  274. Part 1: Protection for electricity, gas, water and sewerage undertakers
  275. 1Paragraph 1
  276. 2Paragraph 2
  277. 3Paragraph 3
  278. 4Paragraph 4
  279. 5Paragraph 5
  280. 6Paragraph 6
  281. 7Paragraph 7
  282. 8Paragraph 8
  283. 9Paragraph 9
  284. 10Paragraph 10
  285. 11Paragraph 11
  286. Part 2: For the Protection of National Grid as Electricity and Gas Undertaker
  287. 12Application
  288. 13Interpretation
  289. 14Interpretation
  290. 15Apparatus of Undertakers in stopped up streets
  291. 16Acquisition of land
  292. 17Removal of apparatus
  293. 18Facilities and rights for alternative apparatus
  294. 19Retained apparatus: protection Gas Undertakers
  295. 20Retained apparatus: protection Electricity Undertakers
  296. 21Expenses
  297. 22Compensation
  298. 23Enactments and agreements
  299. 24Co-operation
  300. 25Access
  301. 26Arbitration
  302. 27Notices
  303. Part 3: For the Protection of Cadent Gas Limited as Gas Undertaker
  304. 28Application
  305. 29Interpretation
  306. 30On Street Apparatus
  307. 31Apparatus of Undertakers in stopped up streets
  308. 32Acquisition of land
  309. 33Removal of apparatus
  310. 34Facilities and rights for alternative apparatus
  311. 35Retained apparatus: protection Gas Undertakers
  312. 36Expenses
  313. 37Compensation
  314. 38Enactments and agreements
  315. 39Co-operation
  316. 40Access
  317. 41Arbitration
  318. 42Notices
  319. Part 4: Protection for Operators of Electronic Communications Code Networks
  320. 43Paragraph 43
  321. 44Paragraph 44
  322. 45Paragraph 45
  323. 46Paragraph 46
  324. 47Paragraph 47
  325. Part 5: Protection of Network Rail Infrastructure Limited
  326. 48Paragraph 48
  327. 49Paragraph 49
  328. 50Paragraph 50
  329. 51Paragraph 51
  330. 52Paragraph 52
  331. 53Paragraph 53
  332. 54Paragraph 54
  333. 55Paragraph 55
  334. 56Paragraph 56
  335. 57Paragraph 57
  336. 58Paragraph 58
  337. 59Paragraph 59
  338. 60Paragraph 60
  339. 61Paragraph 61
  340. 62Paragraph 62
  341. 63Paragraph 63
  342. 64Paragraph 64
  343. 65Paragraph 65
  344. 66Paragraph 66
  345. 67Paragraph 67
  346. 68Paragraph 68
  347. 69Paragraph 69
  348. Part 6: For the Protection of Anglian Water Services Limited
  349. 70Paragraph 70
  350. Part 7: For the protection of the Environment Agency and drainage authorities
  351. 71Paragraph 71
  352. 72Paragraph 72
  353. 73Paragraph 73
  354. 74Paragraph 74
  355. 75Paragraph 75
  356. 76Paragraph 76
  357. 77Paragraph 77
  358. 78Paragraph 78
  359. 79Paragraph 79
  360. 80Paragraph 80
  361. 81Paragraph 81
  362. Part 8: For the protection of Ørsted Hornsea Project Three (UK) Ltd
  363. 82Paragraph 82
  364. 83Paragraph 83
  365. 84Paragraph 84
  366. 85Paragraph 85
  367. 86Paragraph 86
  368. 87Paragraph 87
  369. 88Paragraph 88
  370. 89Paragraph 89
  371. 90Paragraph 90
  372. 91Paragraph 91
  373. 92Paragraph 92
  374. 93Paragraph 93
  375. 94Paragraph 94
  376. 95Paragraph 95
  377. 96Paragraph 96
  378. 97Paragraph 97
  379. Schedule 17: Compensation to protect the coherence of the national site network
  380. Part 1: Flamborough and Filey Coast Special Protection Area: Delivery of measures to compensate for kittiwake loss
  381. 1Paragraph 1
  382. 2Paragraph 2
  383. 3Paragraph 3
  384. 4Paragraph 4
  385. 5Paragraph 5
  386. 6Paragraph 6
  387. 7Paragraph 7
  388. 8Paragraph 8
  389. 9Paragraph 9
  390. 10Paragraph 10
  391. 11Paragraph 11
  392. Part 2: Alde-Ore Estuary Special Protection Area: Delivery of measures to compensate for the loss of lesser black-backed gull
  393. 12Paragraph 12
  394. 13Paragraph 13
  395. 14Paragraph 14
  396. 15Paragraph 15
  397. 16Paragraph 16
  398. 17Paragraph 17
  399. 18Paragraph 18
  400. 19Paragraph 19
  401. 20Paragraph 20
  402. 21Paragraph 21
  403. 22Paragraph 22
  404. Part 3: Haisborough, Hammond and Winterton Special Area of Conservation: Delivery of measures to compensate for cable installation and protection
  405. 23Paragraph 23
  406. 24Paragraph 24
  407. 25Paragraph 25
  408. 26Paragraph 26
  409. 27Paragraph 27
  410. 28Paragraph 28
  411. 29Paragraph 29
  412. 30Paragraph 30
  413. 31Paragraph 31
  414. 32Paragraph 32
  415. 33Paragraph 33
  416. 34Paragraph 34
  417. 35Paragraph 35
  418. 35Paragraph 35
  419. 36Paragraph 36
  420. 37Paragraph 37
  421. 38Paragraph 38
  422. 39Paragraph 39
  423. 40Paragraph 40
  424. Explanatory note