Schedule 2 Requirements
- 1Interpretation
- 2Time limits
- 3Detailed design
- 4Highway accesses
- 5Fencing and other means of enclosure
- 6Surface and foul water drainage
- 7Surface water drainage – contamination
- 8Contaminated land and groundwater
- 9Disposal of contaminated materials
- 10Earthworks and remediation
- 11Ecological management
- 12Code of construction practice and CEMP
- 13Suppression of dust and dirt during construction
- 14Construction traffic routing and management plan
- 15Control of noise during construction and commissioning
- 16External lighting during construction
- 17Unexploded ordnance (UXO) survey
- 18Travel plan – construction
- 19Flooding – mitigation
- 20Flooding – warning and evacuation plan
- 21Fire prevention
- 22Otter mitigation strategy
- 23Asbestos
- 24Storage of liquids on site
- 25Database of tall structures
- 26Aviation safety
- 27European protected species
- 28Construction hours
- 29Piling and vibration
- 30Control of artificial light emissions
- 31Control of dust emissions
- 32Waste management on site
- 33Travel plan and traffic management plan – operational period
- 34Combined heat and power
- 35Site safety and signage
- 36Control of noise during operational phase
- 37External storage
- 38Deliveries of fuel stock by road
- 39Biomass fuel sustainability
- 40Decommissioning
- 41Workforce development strategy
- 42Requirement for written approval
- 43Amendments to approved details