The North Blyth Biomass Power Station Order 2013
S.I. 2013/1873 · Made 24 July 2013
Infrastructure Planning, England
Made 24th July 2013
Coming into force 15th August 2013
The single appointed person, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has, in accordance with section 83(1) of the 2008 Act, made a report and recommendation to the Secretary of State.
The Secretary of State, having considered the report and recommendation of the single appointed person, and decided the application, has determined to make an Order giving effect to the proposals comprised in the application with modifications which in the opinion of the Secretary of State do not make any substantial change to the proposals.
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120 and 149A of the 2008 Act, makes the following Order:
Annotations to the whole text
Footnotes
- f1
-
S.I. 2009/2264, amended by S.I. 2010/602, 2012/635, 2012/2732.
- f2
-
2008 c.29. The relevant provisions of the 2008 Act are amended by Part 6 of Chapter 6 of, and Schedule 13 to, the Localism Act 2011 (c.20).
- f3
-
Following the abolition of the Infrastructure Commission on 1st April 2012 the single person appointed under section 61(2) of the 2008 Act is treated as if appointed by the Secretary of State by virtue of a direction given by the Secretary of State under section 129 of the Localism Act 2011.
- f4
-
S.I. 2010/103, amended by SI 2012/635.
Contents
- 1Citation and commencement
- 2Interpretation
- 3Development consent etc granted by the Order
- 4Procedure in relation to approvals etc under the Requirements
- 5Maintenance of authorised development
- 6Operation of generating station
- 7Benefit of Order
- 8Defence to proceedings in respect of statutory nuisance
- 9Street works
- 10Agreements with street authorities
- 11Discharge of water
- 12Authority to survey and investigate the land
- 13Compulsory acquisition of land
- 14Compulsory acquisition of land – incorporation of the minerals code
- 15Time limit for exercise of authority to acquire land compulsorily
- 16Compulsory acquisition of rights
- 17Private rights of way
- 18Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 19Acquisition of subsoil only
- 20Acquisition of part of certain properties
- 21Rights under or over streets
- 22Statutory undertakers
- 23Recovery of costs of new connections
- 24Railway and navigation undertakings
- 25Application of landlord and tenant law
- 26Operational land for purposes of the 1990 Act
- 27Deemed licence for purposes of the 2009 Act
- 28Certification of plans etc
- 29Arbitration
- 30Crown rights
- 31Protective provisions
- Signature
- Schedule 1: Authorised development
- 1Paragraph 1
- 2Paragraph 2
- Schedule 2: Requirements
- 1Interpretation
- 2Time limits
- 3Detailed design
- 4Highway accesses
- 5Fencing and other means of enclosure
- 6Surface and foul water drainage
- 7Surface water drainage – contamination
- 8Contaminated land and groundwater
- 9Disposal of contaminated materials
- 10Earthworks and remediation
- 11Ecological management
- 12Code of construction practice and CEMP
- 13Suppression of dust and dirt during construction
- 14Construction traffic routing and management plan
- 15Control of noise during construction and commissioning
- 16External lighting during construction
- 17Unexploded ordnance (UXO) survey
- 18Travel plan – construction
- 19Flooding – mitigation
- 20Flooding – warning and evacuation plan
- 21Fire prevention
- 22Otter mitigation strategy
- 23Asbestos
- 24Storage of liquids on site
- 25Database of tall structures
- 26Aviation safety
- 27European protected species
- 28Construction hours
- 29Piling and vibration
- 30Control of artificial light emissions
- 31Control of dust emissions
- 32Waste management on site
- 33Travel plan and traffic management plan – operational period
- 34Combined heat and power
- 35Site safety and signage
- 36Control of noise during operational phase
- 37External storage
- 38Deliveries of fuel stock by road
- 39Biomass fuel sustainability
- 40Decommissioning
- 41Workforce development strategy
- 42Requirement for written approval
- 43Amendments to approved details
- Schedule 3Streets subject to street works
- Schedule 4: Deemed licence under the Marine and Coastal Access Act 2009
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed activities
- Part 2: Conditions applying to licensed activities
- Chapter: General conditions
- 1Notification of commencement and completion
- 2Project wide conditions
- 3Activity specific conditions
- Schedule 5: Protective provisions
- 1For the protection of Network Rail
- 2For the protection of Network Rail
- 3For the protection of Network Rail
- 4For the protection of Network Rail
- 5For the protection of Network Rail
- 6For the protection of Network Rail
- 7For the protection of Network Rail
- 8For the protection of Network Rail
- 9For the protection of Network Rail
- 10For the protection of Network Rail
- 11For the protection of Network Rail
- 12For the protection of Network Rail
- 13For the protection of Network Rail
- 14For the protection of Network Rail
- 15For the protection of Network Rail
- 16For the protection of Network Rail
- 17For the protection of Network Rail
- 18For the protection of Network Rail
- 19For the protection of Network Rail
- 20For the protection of Network Rail
- 21For the protection of Network Rail
- Explanatory note