Schedule 4 STREETS TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDEDI1

England, Wales and Scotland

(1)

Area

(2)

Street to be stopped up

(3)

Extent of stopping up

(4)

New street to be substituted

District of South Northamptonshire and Borough of NorthamptonM1 motorway slip roadThe existing highway within the area marked i on the access and rights of way plans (Document 2.3B) shown edged blue with red and white hatching.Proposed highway M1 within the area marked ii on the access and rights of way plans (Inset 2A of Document 2.3B) shown edged blue with blue hatching.
District of South Northamptonshire

Blisworth Road

(Parish of Roade)

The existing highway within the area marked iii on the access and rights of way plans (Document 2.3D) shown edged blue with red and white hatching.

(i) Proposed highway within the area marked iv on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching;

(ii) Proposed highway A508 within the area marked v on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching; and

(iii) Proposed highway within the area marked vi on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching.

A508 highwayThe existing highway within the area marked vii on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.

(i) Proposed highway within the area marked viii on the access and rights of way plans (Inset 5A of Document 2.3E) shown edged blue with orange hatching; and

(ii) Proposed highway A508 within the area marked ix on the access and rights of way plans (Inset 5A of Document 2.3E) shown edged blue with orange hatching.

A508 highwayThe existing highway within the area marked x on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.Proposed highway A508 within the area marked xi on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching.
C26 Rookery LaneThe existing highway within the area marked xii on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.Proposed highway C26 within the area marked xiii on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching.
C26 Ashton RoadThe existing highway within the area marked xiv on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching.Proposed highway C26 within the area marked xv on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching.