Part 2 HIGHWAYS SUBJECT TO 50MPH SPEED LIMITI1

England, Wales and Scotland

(1)

Location

(2)

Description

(3)

Event

A45 NorthboundFrom a point 80 metres north of the M1 overbridge to a point 390 metres north of the junction between the A45 and Watering Lane; the centreline of which is shown coloured green between points A and B as shown on the speed limit plans (Document 2.7A).Completion of Works No. 8
A45 SouthboundFrom a point 390 metres north of the junction between the A45 and Watering Lane to a point 115 metres north of the M1 overbridge; the centreline of which is shown coloured green between points C and E as shown on the speed limit plans (Document 2.7A)Completion of Works No. 8
A45 Southbound merge slip road from the Bridge Meadow Way roundaboutFrom a point 165 metres north of the merge with the A45 southbound to the merge itself; the centreline of which is shown coloured green between points F and D as shown on the speed limit plans (Document 2.7A).Completion of Works No. 8
A45 signalised roundabout at M1 Junction 15The circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured green between points E, G, H, J, K, L, A and returning to E as shown on the speed limit plans (Document 2.7A).Completion of Works No. 8
Link road within A45 signalised roundabout at M1 Junction 15The link road within the circulatory carriageway at the junction between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured green between points H and L as shown on the speed limit plans (Document 2.7A).Completion of Works No. 8
Saxon AvenueFrom the junction between Saxon Avenue and the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15 to a point 30 metres west of that junction; the centreline of which is shown coloured green between points G and M as shown on the speed limit plans (Document 2.7A).Completion of Works No. 8
A508 NorthboundFrom the roundabout junction between the A508 and the main site access road to the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured orange between points N and P as shown on the speed limit plans (Document 2.7A).Completion of Works No. 7
A508 SouthboundFrom the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15 to the roundabout junction between the A508 and the main site access road; the centreline of which is shown coloured orange between points Q and R as shown on the speed limit plans (Document 2.7A).Completion of Works No. 7
A508 Northampton Road and rail terminal access road roundaboutThe circulatory carriageway of the roundabout junction between the main site access road and Northampton Road; the centreline of which is shown coloured orange between points N, R, S and returning to N as shown on the speed limit plans (Document 2.7A).Completion of Works No. 7
A508 Northampton RoadFrom the roundabout junction between the A508 and the main site access road to a point 30 metres north of the junction between the A508 and the unnamed road to Quinton; the centreline of which is shown coloured orange between points S and T as shown on the speed limit plans (Documents 2.7A and 2.7B).Completion of Works No. 7
A508 Roade Bypass and Northampton Road roundaboutThe circulatory carriageway of the roundabout junction between the A508 Roade Bypass and Northampton Road; the centreline of which is shown coloured orange between points U, AL, V and returning to U as shown on the speed limit plans (Document 2.7B).Completion of Works No. 13
Stratford RoadFrom a point 512 metres south of the junction between Stratford Road and High Street to the roundabout junction between the A508 Roade Bypass and Stratford Road; the centreline of which is shown coloured orange between points AG and AJ as shown on the speed limit plans (Document 2.7C).Completion of Works No. 13
A508 Roade Bypass and Stratford Road roundaboutThe circulatory carriageway of the roundabout junction between the A508 Roade Bypass and Stratford Road; the centreline of which is shown coloured orange between points AF, AG, AH and returning to AF as shown on the speed limit plans (Document 2.7C).Completion of Works No. 13
A508From a point 250 metres south of the roundabout junction between the A508 Roade Bypass and Stratford Road to that junction; the centreline of which is shown coloured orange between points AH and AK as shown on the speed limit plans (Document 2.7C).Completion of Works No. 13
Northampton RoadFrom the roundabout junction between the A508 Roade Bypass and Northampton Road to a point 162 metres south of that roundabout; the centreline of which is shown coloured orange between points AL and AM as shown on the speed limit plans (Document 2.7B).Completion of Works No. 13

Annotations

Commencement

I1

Sch. 8 Pt. 2 in force at 30.10.2019, see art. 1