Part 4 TEMPORARY SPEED LIMITSI1
England, Wales and Scotland
(1) Location | (2) Temporary limit to be imposed | (3) Description | (4) Duration |
|---|---|---|---|
| A45 Northbound | 50mph | From a point 20 metres north of the roundabout junction with the M1 to a point 300 metres before the start of the diverge to the Wootton Interchange. | From commencement of Works No. 8 until completion of Works No. 8 |
| A45 Southbound | 50mph | From the diverge at the Wootton Interchange to a point 110 metres north of the roundabout junction with the M1. | From commencement of Works No. 8 until completion of Works No. 8 |
| A508 | 40mph | From a point 30 metres north of the junction between the A508 and the unnamed road to Quinton to the circulatory carriageway at M1 Junction 15. | From commencement of any of Works Nos. 1 to 6 until completion of Works No. 7 |
| A508 | 30mph | From a point 68 metres south of the junction between the A508 and Field View to a point 500 metres south of the junction between the A508 and the C26 Ashton Road. | From commencement of Works No. 14 until completion of Works No. 14 |
| A508 | 30mph | From a point 400 metres north of the junction between the A508 and the C85 Pury Road to a point 250 metres south of that junction. | From commencement of Works No. 14 until completion of Works No. 14 |
| M1 Northbound | 50mph | From a point 1 kilometre before the start of the diverge to junction 15 to a point 50 metres south of overbridge at junction 15. | From commencement of Works No. 8 until completion of Works No. 8 |
| M1 Southbound | 50mph | From a point 1 kilometre before the start of the diverge to junction 15 to a point 170 metres north of the end of the merge at junction 15. | From commencement of Works No. 8 until completion of Works No. 8 |
Annotations
Commencement
- I1
Sch. 8 Pt. 4 in force at 30.10.2019, see art. 1