Paragraph 21 I1
England and Wales
In relation to a work which is a specified work because of its proximity to or effect on a sewer, the plans to be submitted to the specified undertaker under paragraph 20 shall be detailed plans describing—
(a)
the exact position of the specified work;
(b)
the level at which it is proposed to be constructed or renewed;
(c)
the manner of its construction or renewal;
(d)
the position of all sewers within 15 metres of the specified work or upon which the specified work will impose a load; and
(e)
by way of detailed drawings, every alteration proposed to be made to any such sewer.
Annotations
Commencement
- I1
Sch. 12 para. 21 in force at 9.6.2009, see art. 1