Paragraph 4
A description of—
(a)
the principal systems on the installation;
(b)
the installation layout;
(c)
the process technology to be used;
(d)
the principal features of any pipeline;
(e)
any petroleum-bearing reservoir intended to be exploited using the installation; and
(f)
the basis of design for any wells to be connected to the installation.