Part 2 Installations not stationed at the time this Order is madeI1
United Kingdom
| (1) Name or other designation | (2) Latitude | (3) Longitude |
|---|---|---|
| Alligin Well AP01, Block 204/20a, Alligin Field | 60°22.333'N | 04°11.631'W |
| Cook water injection well, Block 21/20a, Cook Field | F157°21.54'N | 00°49.98'E |
| DC6 Manifold Structure, Block 211/13a, Penguins Field | 61°37.77'N | 01°29.59'E |
| DC7 Manifold Structure, Block 211/13a, Penguins Field | 61°36.72'N | 01°32.66'E |
| DC8 Manifold Structure, Block 211/13a, Penguins Field | 61°38.98'N | 01°29.32'E |
| DC9 Manifold Structure, Block 211/8, Penguins Field | 61°40.28'N | 01° 29.02'E |
| Brodgar (H4) Subsea, Block 21/3a, Brodgar Field | 57°55.373'N | 0°27.216'E |
Annotations
Textual amendments
- F1
Entries in Sch. Pt. 2 substituted (17.4.2020) by The Offshore Installations (Safety Zones) Order 2020 (S.I. 2020/390), arts. 1(2), 3
Commencement
- I1
Sch. Pt. 2 in force at 6.3.2019, see art. 1(2)