OpenLegislation

Part 2 Installations not stationed at the time this Order is madeI1

United Kingdom

(1) Name or other designation(2) Latitude(3) Longitude
Alligin Well AP01, Block 204/20a, Alligin Field60°22.333'N04°11.631'W
Cook water injection well, Block 21/20a, Cook FieldF157°21.54'N 00°49.98'E
DC6 Manifold Structure, Block 211/13a, Penguins Field61°37.77'N01°29.59'E
DC7 Manifold Structure, Block 211/13a, Penguins Field61°36.72'N01°32.66'E
DC8 Manifold Structure, Block 211/13a, Penguins Field61°38.98'N01°29.32'E
DC9 Manifold Structure, Block 211/8, Penguins Field61°40.28'N01° 29.02'E
Brodgar (H4) Subsea, Block 21/3a, Brodgar Field57°55.373'N0°27.216'E

Annotations

Textual amendments

F1

Entries in Sch. Pt. 2 substituted (17.4.2020) by The Offshore Installations (Safety Zones) Order 2020 (S.I. 2020/390), arts. 1(2), 3

Commencement

I1

Sch. Pt. 2 in force at 6.3.2019, see art. 1(2)