OpenLegislation

Paragraph 5 Cost-benefit analysisF1

The application for a variation of the conditions of the permit required by paragraph 4 must be accompanied by a cost-benefit analysis that assesses the costs and benefits of operating the installation, or converting the installation to operate, as a high-efficiency cogeneration installation.

Annotations

Textual amendments

F1

Sch. 13A inserted (10.12.2014) by The Pollution Prevention and Control (Industrial Emissions) (Amendment) Regulations (Northern Ireland) 2014 (S.R. 2014/304), reg. 1, Sch.