OpenLegislation

Paragraph 4 Cost-benefit analysisF1

An operator of an installation, carrying out an activity with a total net thermal input exceeding 20 megawatts and generating electricity must apply to the enforcing authority under regulation 19(2) for a variation of the conditions of his permit before undertaking a substantial refurbishment.

Annotations

Textual amendments

F1

Sch. 13A inserted (10.12.2014) by The Pollution Prevention and Control (Industrial Emissions) (Amendment) Regulations (Northern Ireland) 2014 (S.R. 2014/304), reg. 1, Sch.