Paragraph 7 Cost-benefit analysisF1
An operator of an installation with a total net thermal input exceeding 20 megawatts, and generating waste heat at a useful temperature level must apply to the enforcing authority under regulation 19(2) for a variation of the conditions of his permit before undertaking a substantial refurbishment.