Paragraph 3 Interpretation – relevant dates and permitting datesF1

(1)

The “relevant date” in relation to a generator means—

(a)

1st January 2019, in the case of a new generator;

(b)

1st October 2019, in the case of an existing generator with a rated thermal input greater than 5 megawatts and less than 50 megawatts which—

(i)

has an emission of nitrogen oxides of equal to or greater than 500mg/ Nm3; and

(ii)

operates for more than 50 hours per year;

(c)

1st January 2025, in the case of an existing generator with a rated thermal input greater than 5 megawatts and less than 50 megawatts which—

(i)

has an emission of nitrogen oxides of less than 500mg/ Nm3; or

(ii)

operates for less than or equal to 50 hours per year;

(d)

1st January 2030, in the case of an existing generator with a rated thermal input equal to or less than 5 megawatts.

(2)

The “permitting date”—

(a)

in relation to a specified generator falling within paragraph 2(1)(a), is the relevant date in relation to that specified generator;

(b)

in relation to a specified generator falling within paragraph 2(1)(b) or (c), is the earliest of the relevant dates in relation to the generators comprising that specified generator.

(3)

For the purposes of sub-paragraph (1)—

  • “existing generator” means a generator with a rated thermal input equal to or greater than 1 megawatt and less than 50 megawatts which came into operation before 1st December 2016, or;

  • “new generator” means any specified generator which is not an existing generator.

(4)

For the purposes of this paragraph, in the case of a generator which is comprised in a specified generator falling within paragraph 2(1)(b) or (c), the generator is deemed to have the total rated thermal input of all the generators comprised in the specified generator.

Annotations

Textual amendments

F1

Sch. 9B inserted (20.3.2018) by The Pollution Prevention and Control (Industrial Emissions) (Amendment) Regulations (Northern Ireland) 2018 (S.R. 2018/33), regs. 1, 7