Paragraph 4 Interpretation - generalF1

In this Schedule—

  • “back-up generator” means a generator operated for the sole purpose of maintaining power supply at a site during an on-site emergency;

  • “balancing services” means any services procured by the transmission system operator in order to balance demand and supply, and to ensure the security and quality of electricity supply;

  • “capacity auction” means a capacity auction conducted under Chapter F [of the Capacity Market Code] for allocating Awarded Capacity to Capacity Market Units and includes T-1 Auctions, T-2 Auctions, T-3 Auctions and T-4 Auctions;

  • “capacity market framework agreement” means the agreement (including an Accession Deed) under which a person becomes bound by this Code;

  • “distribution system” has the meaning given in Article 3 of The Electricity (Northern Ireland) Order 1992;

  • “emission limit value” means the permissible maximum quantity of a substance contained in the waste gases from a generator which may be discharged into the air during a given period;

  • “nitrogen oxides” means nitric oxide and nitrogen dioxide;

  • “transmission system” has the meaning given in Article 3 of The Electricity (Northern Ireland) Order 1992;

  • “transmission system operator” means the person or persons operating the transmission system for Northern Ireland; and

    any reference to emissions expressed in mg/Nm3 is to those emissions defined in accordance with Annex II of the Medium Combustion Plant Directive.

Annotations

Textual amendments

F1

Sch. 9B inserted (20.3.2018) by The Pollution Prevention and Control (Industrial Emissions) (Amendment) Regulations (Northern Ireland) 2018 (S.R. 2018/33), regs. 1, 7