Paragraph 5 Construction Environmental Management Plan etc.I1
England and Wales
A stage of authorised development must not commence until the written Construction Environmental Management Plan (CEMP) for that stage has been approved by the relevant planning authority.
The CEMP for a stage must be in accordance with the principles set out in the environmental statement, the Master CEMP, the COCP and the CTMP.
The CEMP for a stage must, where relevant to that stage, in particular include the following—
an external communications plan;
a pollution incident prevention and control plan;
a site waste management plan;
a construction traffic management plan;
a construction workers travel plan;
a materials management plan;
a plan for storage for reuse of stripped soils within land forming part of haul roads or temporary compounds;
a construction flood plan and flood emergency preparedness plan for any construction site or compound located within undefended flood zone 2 or flood zone 3;
a surface water management plan;
measures for the protection of wildlife;
a reptile and amphibian mitigation strategy; and
nuisance management plans regarding noise and vibration, dust, air pollution and lighting.
The CTMP when required for a stage under sub-paragraph (3) must in particular and where relevant address—
construction traffic routes and operational hours;
site accesses;
the management of junctions to and crossings of the public highway and other public rights of way;
the scheduling and timing of abnormal load movements;
temporary warning signs;
restrictions on vehicle turning movements in to and out of compounds on the A369 Portbury Hundred classified road; and
measures to minimise dust and mud.
The relevant stage must be carried out in accordance with the COCP and the approved CEMP and CTMP for that stage.
Where a part of the authorised development—
is not within a relevant stage or associated development connected with a relevant stage; or
does not consist of preparatory activities,
then that part of the authorised development must be carried out in accordance with the COCP, the Master CEMP and the CTMP.
Annotations
Commencement
- I1
Sch. 2 para. 5 in force at 5.12.2022, see art. 1