OpenLegislation

Part 2 Module A2: Internal production control plus supervised pressure equipment checks at randomF1

  1. 6General
  2. 7Technical documentation
  3. 8Manufacturing
  4. 9Final assessment and pressure equipment, assembly, checks
  5. 10UK marking and declaration of conformity
  6. 11Authorised representative

Annotations

Textual amendments

F1

Sch. 1A inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 24 para. 44 (with Sch. 24 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)