OpenLegislation

Part 8 Module E1: Quality assurance of final pressure equipment inspection and testingF1

  1. 69General
  2. 70Technical documentation
  3. 71Manufacturing
  4. 72Quality system
  5. 73Surveillance under the responsibility of the approved body
  6. 74UK marking and declaration of conformity
  7. 75Authorised representative

Annotations

Textual amendments

F1

Sch. 1A inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 24 para. 44 (with Sch. 24 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)