Regulation 8 Technical documentation and conformity assessmentE1
England, Wales and Scotland
Before placing a pyrotechnic article on the market, a manufacturer must—
have a relevant conformity assessment procedure carried out; and
draw up the technical documentation referred to—
for a pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(a) is being carried out, in point 3(c) of Module B of F1Schedule 2A;
for a pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(b) is being carried out, in point 2 of Module G of Schedule 2A;
for pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(c) is being carried out, in point 3.1(b) of Module H of Schedule 2A.
Annotations
Textual amendments
- F1
Words in reg. 8(b) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 19 para. 5 (with Sch. 19 para. 36) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only