Part 3 REQUIREMENTS
England, Wales and Scotland
- 1Time limits
- 2Detailed offshore design parameters
- 3Detailed offshore design parameters
- 4Detailed offshore design parameters
- 5Detailed offshore design parameters
- 6Cable parameters
- 7Onshore substation parameters
- 8Site-specific plan for the detailed design approval of the onshore substation at Oakendene
- 9Detailed design approval – extension to National Grid substation
- 10Stages of onshore works
- 11Offshore Decommissioning
- 12Provision of landscaping
- 13Implementation and maintenance of landscaping
- 14Biodiversity net gain
- 15Highway accesses outside the South Downs National Park
- 16Highway accesses in the South Downs National Park
- 17Operational drainage management
- 18Operational drainage management
- 19Onshore Archaeology
- 20Public rights of way
- 21Open access land
- 22Code of construction practice
- 23Onshore construction method statement
- 24Construction traffic management plan
- 25Contamination risk
- 26Coastal erosion
- 27Operation phase maintenance
- 28Operation phase maintenance
- 29Control of noise during operational phase
- 30Control of artificial light emissions during operational phase
- 31Control of artificial light emissions during operational phase
- 32Operational Travel Plan
- 33Skills and Employment Strategy
- 34Construction Communication Plan
- 35Onshore decommissioning
- 36Primary Surveillance Radar Mitigation
- 37Instrument flight procedures
- 38Vegetation retention and removal
- 39Horsham District mitigation and enhancement
- 40Public rights of way and landscape enhancement
- 41National Park enhancement and furtherance
- 42European protected species licence
- 43Site-specific plan for the detailed design approval of the temporary construction compounds at Washington and Climping
- 44Crossing Schedule
- 45Requirement for written approval
- 46Amendments to approved details