The Renewables Obligation (Scotland) Order 2009
S.S.I. 2009/140 · Made 31 March 2009
ELECTRICITY
Made 31st March 2009
Coming into force in accordance with Article 1
The Scottish Ministers make the following Order in exercise of the powers conferred by sections 32 to 32M of the Electricity Act 1989 M1 and all other powers enabling them to do so.
In accordance with section 32L(3) of that Act, a draft of this instrument has been laid before and approved by resolution of the Scottish Parliament.
In accordance with section 32D(4) of that Act the Scottish Ministers have had regard to the matters referred to in that section.
In accordance with section 32L(1) of that Act they have consulted the Gas and Electricity Markets Authority, the Gas and Electricity Consumer Council, electricity suppliers to whom this Order applies, and such generators of electricity from renewable sources and other persons as they considered appropriate.
Annotations to the whole text
Marginal citations
- M1
1989 c. 29, as substituted by section 37 of the Energy Act 2008 (c. 32).
Contents
- Part 1: Introductory provisions
- 1Citation and commencement
- 2Interpretation
- 3Waste as a renewable source
- 4Biomass and fuels which are to be treated as biomass
- 4AFossil derived bioliquid
- Part 2: The renewables obligation
- 5The renewables obligation
- 6Calculation A
- 7Part of calculation A referable to Great Britain
- 8Part of calculation A referable to Northern Ireland
- 9Calculation B
- 10Calculation C Repealed
- 11Determining the total number of renewables obligation certificates to be produced in an obligation period
- 12Determining the number of renewables obligation certificates to be produced by a designated electricity supplier in order to discharge its renewables obligation
- 12ADetermining the number of renewables obligation certificates to be produced by a designated electricity supplier in order to discharge its renewables obligation: obligation periods beginning on or after 1st April 2019
- 12BDetermining the number of renewables obligation certificates to be produced by a designated electricity supplier in order to discharge its renewables obligation: special arrangements for obligation periods in respect of which article 12A does not apply
- 12CDetermining the number of renewables obligation certificates to be produced by a designated electricity supplier in order to discharge its renewables obligation: revisions of the obligation level for the 2024/25 obligation period
- 13Further provision in relation to the production of renewables obligation certificates
- Part 3: Matters to be certified by and content of SROCs
- 14Matters to be certified by SROCs
- 15When electricity is to be regarded as supplied to customers in Great Britain or Northern Ireland
- 16When electricity is used in a permitted way for SROCs certifying matters within section 32B(7) or (8) of the Act
- Part 4: Cases and circumstances when a SROC must not be issued
- 17Excluded generating stations
- 17AGenerating stations accredited for longer than 20 years
- 17AAOffshore wind turbines registered for longer than 20 years
- 17ABGenerating stations using excluded capacity to generate electricity
- 17BMicrogenerators in respect of which feed-in tariffs may be available
- 17CGenerating stations (other than microgenerators) accredited before feed-in tariffs become available
- 17DGenerating stations (other than microgenerators) accredited after feed-in tariffs become available
- 17EArticles 17C and 17D: supplemental
- 18Generating stations first commissioned before 1st January 1990
- 19Generating stations generating under arrangements referred to in the Electricity (Northern Ireland) Order 1992
- 20Generating stations in respect of which a NFFO arrangement applied but was terminated
- 21Non-commissioned generating stations in respect of which a NFFO arrangement applies
- 21AElectricity in respect of which a CFD or investment contract applies
- 21BCombustion units in relation to which a CFD or investment contract has been entered into
- 22Circumstances in which no SROCs are to be issued in respect of electricity generated from renewable sources
- 22ZACircumstances in which no SROCs are to be issued in respect of electricity generated from solid or gaseous biomass
- 22ACircumstances in which no SROCs are to be issued in respect of electricity generated from bioliquid
- 22BCommon agricultural policy requirements
- 22CElectricity generated by certain types of biomass generating station
- 23Circumstances in which no SROCs are to be issued by virtue of section 32C(8)(a) of the Act
- Part 5: SROCs to be issued by Authority in respect of RO eligible renewable output
- 23ARO input electricity, RO output electricity and ineligible renewable sources
- 24SROCs to be issued by Authority in respect of a generating station's RO eligible renewable output
- 25Calculating a generating station’s RO eligible renewable output
- 26RO eligible renewable output of a qualifying combined heat and power generating station
- Part 6: Banding and grandfathering
- 27The amount of electricity to be stated in each SROC
- 28Electricity generated by qualifying combined heat and power generating stations
- 28AHigh-range co-firing in the 2013/14 obligation period
- 28BCo-firing of regular bioliquid in the 2013/14 and 2014/15 obligation periods
- 28CLow-range co-firing in the 2013/14 and 2014/15 obligation periods
- 28DLow-range co-firing of relevant energy crops
- 28ELow-range co-firing of relevant energy crops with CHP
- 29Microgenerators
- 30Generating stations which were accredited as at 11th July 2006
- 30AOffshore wind generating stations using 2006/10 wind turbines
- 30BWave and tidal stream generating stations
- 30COffshore wind generating stations using test and demonstration wind turbines
- 30DOffshore wind generating stations using floating wind turbines
- 31Generating stations which were accredited, or held preliminary accreditation, as at 31st March 2009
- 32Generating stations in respect of which a statutory grant has been awarded
- 33Review of banding provisions
- Part 7: Issue and revocation of SROCs
- 34Issue of SROCs to generators and suppliers
- 35Issue of SROCs to agents
- 36General criteria for the issue of SROCs
- 37Criteria applicable to SROCs where article 36(1)(a) or (b) cannot be complied with
- 38Further criterion applicable to SROCs certifying matters within section 32B(3) and (5) of the Act where electricity generated otherwise than on land
- 39Further criteria applicable to SROCs certifying matters within section 32B(3) to (6) of the Act
- 40Further criteria applicable to SROCs certifying matters within section 32B(5), (6) and (8) of the Act
- 41Refusing to issue and revoking SROCs
- 41AWhere SROCs cannot be revoked
- Part 8: Payments to discharge the renewables obligation, dealing with the buy-out and late payment funds, and mutualisation
- 42Interpretation
- 43Payments to discharge the renewables obligation
- 44Late payments to discharge the renewables obligation
- 45Dealing with the buy-out fund: payments into the Consolidated Fund and to the Northern Ireland authority
- 46Dealing with the late payment fund: payments into the Consolidated Fund and to the Northern Ireland authority
- 47Dealing with the buy-out and late payment funds: payments to United Kingdom suppliers
- 48Shortfall in the buy-out and late payment funds: the total mutualisation sum
- 49Payments to be made by suppliers towards the total mutualisation sum
- 50Circumstances in which payments towards the total mutualisation sum are to be re calculated
- 51Re-calculated payments to be made by suppliers towards the total mutualisation sum and repayments by the Authority
- 52Payments to be made to suppliers out of the mutualisation fund
- Part 9: Provision of information, functions of the Authority and modification of this Order in relation to microgenerators in certain circumstances
- 53Provision of information to the Authority
- 54Information to be provided to the Authority where electricity is generated from biomass ...
- 54ABioliquid sustainability audit report
- 54BSolid and gaseous biomass sustainability audit report
- 55Provision of information to the Secretary of State
- 56Exchange of information with the Northern Ireland authority
- 57Functions of the Authority
- 58Preliminary accreditation of generating stations
- 58ZZAAccreditation of generating stations
- 58ZZBPreliminary accreditation and accreditation: common provisions
- 58ZARegistration as a grace period generating station
- 58ARegistration of offshore wind turbines
- 58BRegistration of additional capacity
- 59SROC Register
- 60Modification of this Order in relation to microgenerators in certain circumstances
- 61Revocation, transitional and savings
- Signature
- Schedule A1: GREENHOUSE GAS EMISSION CRITERIA FOR BIOLIQUID
- 1Interpretation
- 2The greenhouse gas emission criteria
- 3Calculating the percentage difference
- 4Calculating the percentage difference
- 5Calculating the percentage difference Repealed
- 6Calculating the percentage difference
- Schedule A1A: GREENHOUSE GAS EMISSION CRITERIA FOR SOLID AND GASEOUS BIOMASS
- Part 1: Greenhouse gas emission criteria
- 1Interpretation
- 2The greenhouse gas emission criteria
- 3Calculating the greenhouse gas emissions
- 4Paragraph 4
- 5Paragraph 5
- Part 2: Actual value method
- 6Paragraph 6
- 7Paragraph 7
- Part 3: Default value method
- 8Paragraph 8
- 9Paragraph 9
- 4Default greenhouse gas emissions from the production of biomass
- Schedule A2: Land criteria
- 1Interpretation
- 2Land criteria: bioliquids
- 3Land criteria: woody biomass
- 4Land criteria: other fuels
- 5Protected sources
- 6Sustainable source
- 7Exempt purposes
- Schedule 1CALCULATION OF THE SROC OBLIGATION
- Schedule 2: ELECTRICITY TO BE STATED IN SROCs
- Part 1: INTERPRETATION
- 1Paragraph 1
- 2AMOUNT OF ELECTRICITY TO BE STATED IN SROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY
- 2AAMOUNT OF ELECTRICITY TO BE STATED IN SROCs ISSUED FOR ELECTRICITY GENERATED USING 2013/14 CAPACITY, 2014/15 CAPACITY, 2015/16 CAPACITY OR POST-2016 CAPACITY
- 2BAMOUNT OF ELECTRICITY TO BE STATED IN SROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY OR 2013/15 CAPACITY WHERE ARTICLE 28(3) OR (4) APPLIES
- 2CAMOUNT OF ELECTRICITY TO BE STATED IN SROCS ISSUED FOR ELECTRICITY GENERATED USING 2015/16 CAPACITY WHERE ARTICLE 28(5) APPLIES
- 2DAMOUNT OF ELECTRICITY TO BE STATED IN SROCS ISSUED FOR ELECTRICITY GENERATED USING POST-2016 CAPACITY WHERE ARTICLE 28(6) APPLIES
- 3AMOUNT OF ELECTRICITY TO BE STATED IN RENEWABLES OBLIGATION CERTIFICATES WHERE ARTICLE 30(3) APPLIES
- 4AMOUNT OF ELECTRICITY TO BE STATED IN RENEWABLES OBLIGATION CERTIFICATES WHERE ARTICLE 30(5) OR ARTICLE 31(4) APPLIES
- Schedule 3AMOUNT OF RELEVANT SHORTFALL FOR THE RELEVANT OBLIGATION PERIOD Repealed
- Schedule 3A: ACTUAL VALUE METHOD FOR CALCULATING EMISSIONS FROM THE USE OF BIOMASS Repealed
- 1Paragraph 1 Repealed
- 2Paragraph 2 Repealed
- Schedule 3B: DEFAULT VALUE METHOD FOR CALCULATING EMISSIONS FROM THE USE OF BIOMASS Repealed
- Part 1: METHOD FOR CALCULATING EMISSIONS Repealed
- 1Paragraph 1 Repealed
- 2Paragraph 2 Repealed
- 2DEFAULT GREENHOUSE GAS EMISSIONS FROM THE PRODUCTION OF BIOMASS Repealed
- Schedule 4: THE REGISTER
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Explanatory note