Part 1 AUTHORISED DEVELOPMENTI1
England, Wales and Scotland
A nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act comprising:
Work No. 1 An electricity generating station with a nominal gross electrical output capacity of 65 MWe fuelled by waste and including—
- (a)
three waste processing streams each comprising a reciprocating grate, furnace, boiler and associated air pollution control system;
- (b)
transformer compound;
- (c)
an administration building;
- (d)
a tipping hall;
- (e)
refuse bunkering;
- (f)
a flue gas treatment facility;
- (g)
flues or stack;
- (h)
turbines and turbine hall;
- (i)
air cooled condensers;
- (j)
a facility to enable steam pass-outs and/or hot water pass-outs; and
- (k)
a visitor centre/education facility; and
associated development within the meaning of section 115(2) of the Act comprising—
- (a)
Work No. 2 A post-combustion materials recovery facility for the purpose of treating incinerator bottom ash produced by the electricity generating station comprised in Work No. 1 and including—
- (a)
a screened ash/aggregate yard;
- (b)
buildings housing apparatus and necessary plant for separation of co-mingled metals from incinerator bottom ash and grading of such ash;
- (c)
a separation lagoon;
- (d)
an administration building;
- (e)
a weigh bridge; and
- (f)
a foul water pump house;
- (a)
Work No. 3 A drainage channel to be constructed on an east - west alignment linking with a drainage channel to be constructed pursuant to a review of old minerals permissions bearing statutory reference number BC/CM/2000/08;
Work No. 4 An extension to the attenuation pond to be constructed pursuant to a review of old minerals permissions bearing statutory reference number BC/CM/2000/08;
Annotations
Commencement
- I1
Sch. 1 Pt. 1 in force at 28.2.2013, see Introductory text