The Rookery South (Resource Recovery Facility) Order 2011
S.I. 2013/680 · Made 22 November 2011 · Extends to England, Wales and Scotland
Infrastructure Planning, England
Made 22nd November 2011
Laid before Parliament 29th November 2011
Coming into force 28th February 2013
An application has been made to the Infrastructure Planning Commission in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009f1 for an Order granting development consent;
The application was examined by a Panel appointed by the Chair of the Infrastructure Planning Commission pursuant to Chapter 4 of Part 6 of the Planning Act 2008f2 (“the 2008 Act”);
The Panel, having considered the representations made and not withdrawn and the application with the documents that accompanied the application, in accordance with section 104 of the 2008 Act has determined to make an Order giving effect to the proposals comprised in the application with modifications which in its opinion do not make any substantial change in the proposals;
The Panel has sent a draft of the Order to the Secretary of State in accordance with subsection (2) of section 121 of the 2008 Act and the Secretary of State has not given a direction under subsection (3) of that section;
The Order authorises the compulsory acquisition of land which is the property of local authorities and of land which has been acquired by statutory undertakers for the purposes of their undertaking, representations have been made by the local authorities and statutory undertakers concerned about the application for the Order before the completion of the examination of the application, and the representations have not been withdrawn;
The Order will not come into force until it has been laid before Parliament and has been brought into operation in accordance with the provisions of the Statutory Orders (Special Procedure) Acts 1945 and 1965f3;
Accordingly, in exercise of the powers conferred by sections 114, 115 and 120 of the 2008 Act, the Infrastructure Planning Commission makes the following Order:C1
Annotations to the whole text
Modifications
- C1
Order modified (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 37
Footnotes
- f1
- f2
- f3
-
1945 (9 & 10 Geo.6 c.18) and 1965 c.43.
Contents
- 1Citation
- 2Interpretation
- 3Development consent etc. granted by the Order
- 4Procedure in relation to approvals etc. under requirements
- 5Maintenance of authorised development
- 6Operation of generating station
- 7Benefit of the Order
- 8Guarantees in respect of payment of compensation
- 9Defence to proceedings in respect of statutory nuisance
- 10Street works
- 11Public rights of way
- 12Temporary stopping up of streets
- 13Access to works
- 14Agreements with street authorities
- 15Discharge of water
- 16Authority to survey and investigate the land
- 17Compulsory acquisition of land
- 18Power to override easements and other rights
- 19Time limit for exercise of authority to acquire land compulsorily
- 20Compulsory acquisition of rights
- 21Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 22Acquisition of subsoil only
- 23Acquisition of part of certain properties
- 24Rights under or over streets
- 25Temporary use of land for carrying out the authorised development
- 26Temporary use of land for maintaining authorised development
- 27Statutory undertakers
- 28Railway undertakings
- 29Application of landlord and tenant law
- 30Operational land for purposes of the 1990 Act
- 31Felling or lopping of trees
- 32Certification of plans etc.
- 33Protection of Network Rail Infrastructure Limited
- 34Arbitration
- Signature
- Schedule 1: AUTHORISED DEVELOPMENT AND REQUIREMENTS
- 1AUTHORISED DEVELOPMENT
- 2REQUIREMENTS
- 1Time limits
- 2Type of waste to be treated
- 3Commencement
- 4Incineration, operation, etc.
- 5Detailed design approval
- 6Detailed design approval
- 7BREEAM Rating
- 8Provision of landscaping
- 9Implementation and maintenance of landscaping
- 10Highway accesses
- 11Fencing and other means of site perimeter enclosure
- 12Surface and foul water drainage
- 13Land stability
- 14Contamination and groundwater
- 15Archaeology
- 16Code of construction practice
- 17Control of noise during construction and operational phase
- 18Control of noise during construction and operational phase
- 19Control of noise during construction and operational phase
- 20Control of noise during construction and operational phase
- 21Control of noise during construction and operational phase
- 22Control of noise during construction and operational phase
- 23Control of noise during construction and operational phase
- 24Construction hours
- 25Combined Heat and Power
- 26Delivery hours and traffic management
- 27CCTV
- 28Loads to be covered
- 29Restoration
- 30Amendments to approved details
- 31Low level restoration scheme
- 32Incinerator bottom ash processing and storage
- 33Incinerator bottom ash processing and storage
- 34Incinerator bottom ash processing and storage
- 35Lighting strategy
- 36Connection to the national grid
- 37Visibility requirements at Green Lane/C94 junction
- 38Vehicle movements
- 39Travel plan
- 40Ecological management scheme
- 41Residual Waste Acceptance Scheme
- Schedule 2STREETS SUBJECT TO STREET WORKS
- Schedule 3: PUBLIC RIGHTS OF WAY
- 1PUBLIC RIGHTS OF WAY EXTINGUISHED
- 2RIGHTS OF WAY CREATED OR IMPROVED
- Schedule 4STREETS TO BE TEMPORARILY STOPPED UP
- Schedule 5ACCESS TO WORKS
- Schedule 6LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 7: PROTECTION OF NETWORK RAIL INFRASTRUCTURE LIMITED
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- Explanatory note