Part 2 RIGHTS OF WAY CREATED OR IMPROVEDI1
England, Wales and Scotland
(1) Area | (2) Existing or new right | (3) New status |
|---|---|---|
| Central Bedfordshire | A new combined footpath and cycleway between points N1 and N2 | Footpath with cycle rights |
| A new combined footpath and cycleway between points N3 and N4 | Footpath with cycle rights | |
| A new combined footpath and cycleway between points N5 and N6 | Footpath with cycle rights | |
| Footpath 72 to be upgraded to include cycle rights between points I1 and I2 | Footpath with cycle rights | |
| Bedford Borough | Footpath to be upgraded to include cycle rights between points I8 and I9 | Footpath with cycle rights |
| Bedford Borough and Central Bedfordshire | Footpath to be upgraded to include cycle rights between points I3 and, thence by a circular route via points I4-I7 to Point I3 | Footpath with cycle rights |
Annotations
Commencement
- I1
Sch. 3 Pt. 2 in force at 28.2.2013, see Introductory text