OpenLegislation

Part 2 RIGHTS OF WAY CREATED OR IMPROVEDI1

England, Wales and Scotland

(1)

Area

(2)

Existing or new right

(3)

New status

Central BedfordshireA new combined footpath and cycleway between points N1 and N2Footpath with cycle rights
A new combined footpath and cycleway between points N3 and N4Footpath with cycle rights
A new combined footpath and cycleway between points N5 and N6Footpath with cycle rights
Footpath 72 to be upgraded to include cycle rights between points I1 and I2Footpath with cycle rights
Bedford BoroughFootpath to be upgraded to include cycle rights between points I8 and I9Footpath with cycle rights
Bedford Borough and Central BedfordshireFootpath to be upgraded to include cycle rights between points I3 and, thence by a circular route via points I4-I7 to Point I3Footpath with cycle rights

Annotations

Commencement

I1

Sch. 3 Pt. 2 in force at 28.2.2013, see Introductory text