Part 2 REQUIREMENTS
England, Wales and Scotland
In this Part of this Schedule—
“the approved development plans” mean the plans submitted with the application on 4 August 2010 or later and listed at requirement 6;
“by-products” includes incinerator bottom ash aggregate and ferrous and non-ferrous metal compounds;
“commercially operate” means operate the authorised development for commercial processing of waste and production of electricity for transmission to the national electricity grid following completion of hot commissioning and “commercial operation” and “commercially operated” shall be construed accordingly;
“heavy goods vehicle” means—
- (a)
a heavy goods vehicle of 7.5 tonnes gross vehicle weight or more; and
- (b)
any other vehicle designed for the transport of waste including refuse collection vehicles;
- (a)
“low level restoration scheme” means the scheme for the restoration of Rookery North and Rookery South Pits which has been developed as a part of the review of old minerals permissions application which was submitted to Bedford Borough Council and Central Bedfordshire Council on 5 June 2009 and bears statutory reference number BC/CM/2000/08.
- 1Time limits
- 2Type of waste to be treated
- 3Commencement
- 4Incineration, operation, etc.
- 5Detailed design approval
- 6Detailed design approval
- 7BREEAM Rating
- 8Provision of landscaping
- 9Implementation and maintenance of landscaping
- 10Highway accesses
- 11Fencing and other means of site perimeter enclosure
- 12Surface and foul water drainage
- 13Land stability
- 14Contamination and groundwater
- 15Archaeology
- 16Code of construction practice
- 17Control of noise during construction and operational phase
- 18Control of noise during construction and operational phase
- 19Control of noise during construction and operational phase
- 20Control of noise during construction and operational phase
- 21Control of noise during construction and operational phase
- 22Control of noise during construction and operational phase
- 23Control of noise during construction and operational phase
- 24Construction hours
- 25Combined Heat and Power
- 26Delivery hours and traffic management
- 27CCTV
- 28Loads to be covered
- 29Restoration
- 30Amendments to approved details
- 31Low level restoration scheme
- 32Incinerator bottom ash processing and storage
- 33Incinerator bottom ash processing and storage
- 34Incinerator bottom ash processing and storage
- 35Lighting strategy
- 36Connection to the national grid
- 37Visibility requirements at Green Lane/C94 junction
- 38Vehicle movements
- 39Travel plan
- 40Ecological management scheme
- 41Residual Waste Acceptance Scheme