Paragraph 23 Control of noise during construction and operational phaseI1I2
England, Wales and Scotland
Prior to the commencement of construction for the building envelope to contain Work No. 1 an acoustic design report must be submitted to and approved in writing by Central Bedfordshire Council.
The report must detail─
the noise control measures that are proposed to be included in the design of the building envelope;
acoustic barriers;
predicted sound power levels and noise emissions from the air cooled condensers; and
acoustic attenuation measures for internal plant and equipment.
The measures must be installed in accord with the approved scheme prior to commencement of operation of the authorised development and retained and maintained afterwards in accordance with the manufacturers’ specifications unless Central Bedfordshire Council gives its written consent to any variation.
The acoustic design report must demonstrate compliance with requirements 18 and 19.